Archive for the ‘Trail Crew’ Category

President’s Message: 2015 – A Year in Review

Thursday, December 31st, 2015

2015 has been one of the most active in CORBA’s history. There has been so much happening in our local mountains, in our sport, in our public lands, in the political landscape, and in bicycle advocacy in general. As always, CORBA has done its best to stay on top of the issues, to be leaders in the trail community, and to have a positive impact on our trails, our public lands, our community and our sport. Here’s a quick recap of what’s been happening this year, showing how your membership dollars and donations are being used to benefit all mountain bikers in the Los Angeles and Eastern Ventura Counties.

Advocacy

Puente Hills Landfill Meeting

Puente Hills Landfill Meeting

Much has happened this year on the mountain bike advocacy front. One of the biggest issues has been the start of the process to develop a Management Plan for our year-old San Gabriel Mountains National Monument. The National Forest Foundation convened a Community Collaborative group to develop a broad base of support from a diverse range of stakeholders to help guide the Forest Service in its management of the Angeles National Forest and the SGMNM. CORBA has been involved from the start, in 2014 on the committee to establish the Collaborative, and this year as an active participant in the Collaborative. Forty-five diverse interests are represented, some of whom have traditionally found themselves at odds with our community. This has truly expanded our outreach and strengthened our place in the community.

We’re also continuing to work with Los Angeles County on several fronts: the Castaic Area Trail Master Plan, the Los Angeles County Trails Manual, the now-completed Santa Susana Mountains Trail Master plan, the LA County Park Needs assessment, the Altadena Crest Trail Restoration, the Puente Hills Landfill and bicycle access to trails in general.

This year we joined the Los Angeles Bike Park Collective. We have pending Bike Park proposals with Los Angeles County, the City of Los Angeles, City of Glendale, and Thousand Oaks. Fillmore Bike Park opened this past Spring.

We’re closely monitoring the development of the Santa Monica Mountains Trail Master Plan, which is expected to come out in draft form in 2016. We saw the Rim of the Valley Study completed. Legislation was introduced to create a new National Recreation Area, and expand our new National Monument. We’ve worked with legislators on a pending Wilderness bill, to ensure that it has minimum impact on mountain biking. We’re continuing to work with the Sierra Club and Wilderness Society to ensure that their efforts to protect our public lands do not impact our ability to enjoy them.

This year new e-bike legislation was introduced. Early drafts could have been interpreted to allow electric mountain bikes on non-motorized trails. We worked to clarify that this does not makes e-bike legal on trails. We’ll be watching the e-bike debate closely as they become more popular.

There’s a pending application to build a hotel on the DeAnza Trailhead. CORBA took the lead on asking the City of Calabasas to do a full EIR.

Outside the area, we’re keeping an eye on wilderness proposals in the Sierra Nevada mountains and BLM land swap proposals in the San Jacinto Mountains, both with the potential to close trails to bikes.

(more…)

Vetter Mountain Trail Restoration Progress

Wednesday, December 30th, 2015

Last January the Forest Service allowed some experienced trail maintenance volunteers, who had been previously certified to use chainsaws at the “A” level, to step up their training to a “B” level. Under current regulations, A level sawyers are restricted to 8 inch trees or smaller, and must be supervised. B-level Sawyers are allowed to work unsupervised, on trees up to 24″ in diameter, and can supervise and work with A-level sawyers.

Chainsaw Certification Class of 2015

B Level Chainsaw Certification Class of 2015

CORBA President Steve Messer, and volunteer Mike McGuire both received their B level certification, and have been putting them to use all year. MWBA volunteers Mitch Marich, Brad Benam and Erik Hillard also received their A level certification, along with several other individuals and volunteers from other organizations and areas outside Los Angeles.

Together the CORBA and MWBA sawyer team has been cutting trees from trails all year. We’ve cut trees from Brown Mountain, El Prieto, Sunset Ridge, Gabrielino, Strawberry Peak, Colby Canyon, Mount Lowe East, Sam Merrill and Silver Moccasin trails. Six years after the Station Fire, downed trees are becoming a major and constant problem.

Our biggest project has been Vetter Mountain trail. This was a favorite of local mountain bikers, as the first descent of the classic Chilao Loop (or, more accurately, the Chilao Figure-8). The area was one of the most heavily impacted areas of the forest by the Station Fire. Drought has slowed the area’s recovery, and there are still thousands of dead trees waiting to fall.

We began in early spring 2015, first clearing the Charlton Flats loop road of more than two dozen downed trees just to get to the bottom of the Vetter Mountain Trail and Silver Moccasin trail. We cleared all the deadfall from the lower section of Vetter through to the first road crossing. There were many trees beyond our chainsaw certification level, the largest being just over 50 inches in diameter. These were taken care of by Little Tujunga Hot Shots Captain Greg Stenmo, whose support we were grateful to have.

After the summer heat and when fire danger levels and wind conditions allowed, on October 3rd CORBA and USFS volunteers Mike and Robin McGuire returned to begin work on the next section of the trail. In a day’s work, they were only able to clear the first hundred feet of the trail, with the sheer number of trees stacked like Chinese pickup sticks.

image

We returned on October 8th. In the five days since Mike and Robin were up there, another four trees had fallen across the road. Finally getting to the trail, we began cutting downed trees, poodle dog bush and buckthorn from the overgrown tread. In places it was impossible to see any remnant of trail through the brush and deadfall, so having been familiar with the trail in its pre-fire glory was a must.  The time lapse below gives a pretty good indication of what’s been involved in clearing the trail. This is six hours of work compressed to nine minutes.

We returned on October 23, and November 5. On November 5 we started from the top of the trail, near the site of the old lookout and worked our way down. It was a glorious moment for us to finally have cut and cleared over 150 trees from Vetter Mountain trail, Charlton trail, and the Charlton Loop road. After finishing, we went back and inspected the trail from top to bottom, and found a dozen more trees fallen in areas we’d previously cleared.

Once again we returned on December 17, first clearing downed trees off the road, then several new trees that had fallen across Vetter and Charlton trails. Afterwards we joined the Chilao hotshots crew, who were clearing downed trees from Silver Moccasin trail after the particularly strong windstorms of December.  With our help, they were able to get the job finished in one day.

The trail remains closed to the public. There are still too many dead trees that have been rotting away for six years, waiting to fall every time the wind blows. More than once, when we finished our day’s chainsaw work as the afternoon winds started blowing, we heard more trees falling. Because of these dangers, we are not willing to take in volunteer crews to begin restoring the trail. Since winds have been blowing steadily this past month (over 70mph the week before Christmas), there are probably many more trees down again.

Currently the Forest Service, along with Fire Crews and us as Volunteer Sawyers, are developing a plan to clear remaining standing trees in the trail and road corridors, so that they don’t continue to fall across the trail every time the wind blows. Currently crews are doing that along the Santa Clara Divide Road so that it can be reopened to vehicles next year.

We hope to begin restoration work on the Vetter Mountain trail next year, after we finish the Ken Burton trail. Stay tuned for details.

El Nino Watch: Trail Damage and Riding after it Rains

Tuesday, December 29th, 2015

We are having a severe El Nino event this winter; as a result the weather forecast is for many heavy rainstorms in the early months of 2016. That will help our drought situation, but will have seriously bad impacts on our trails. As well as muddy conditions that interfere with their use, described  below, the rains could be severe enough to erode some trails into huge ruts, and even wash them away in some cases. There may be more mudslides in Pt Mugu State Park (Sycamore Canyon) like we had last year. Furthermore, the rain will spur the chaparral to overgrow the trails, a condition we haven’t had to deal with much over the past couple of years because of the drought. The combination of waterlogged soil and high winds could blow trees over. We’re expecting to have special trailwork days to repair these damaged trails and hope many mountain bikers will want to help us get them back into shape!

Most trails in our local riding area don’t respond well to rain. They have a high content of clay that turns into sticky, slippery muck that binds to everything it touches. It builds up on the tires, like a snowball rolling downhill, until it jams on the frame and the wheels won’t budge. Some models of clipless pedals won’t let go when full of this mud, resulting in the bike and the attached rider lying sideways in a puddle, or worse.

Most wet trails don’t respond well to use until they’ve had time to dry out. Hikers and horses make holes and ridges in the trail that become as hard as concrete when the trail dries. These holes and ridges are good for twisting ankles.

As a rule of thumb, if your foot, tire or hoof makes an impression more than about 1/8 inch deep in the dirt, the trail is still too soft to use. Give it another day or two to dry out before using it!

On wet trails, bikes make grooves along the trail. The next time it rains, the water runs down these grooves and turns them into little ruts, then large ruts that destroy the trail.

The mud is particularly hard to remove. It sticks to the bike and shoes, no matter the efforts to remove it, rubbing off on the bike rack, car carpet and gas/brake pedals, making them slippery. Once home, it takes the careful use of a garden hose to remove the mud but not force water into the sensitive parts of the bike.

For these reasons, riders are well advised to stay off the trails after a rain until they have dried. How long to stay off? That depends on a number of factors including the particular trail, how much rain it received, how much sun it gets after the rain (is it in the shade or face south?), how warm and windy the weather is, and so on. After an isolated light rain you can probably ride the next day. After a heavy rain, you should wait several days. This is something where common sense and experience will help. Remember, tracks deeper than 1/8″ mean the trail is still too soft to use!

All is not lost when the trails are soaking! There are a few trails that hold up well when wet because they have more sand and rock that doesn’t hold the water. Here are a few you should know about:

Space Mountain (Los Robles Trail West) to the picnic table is almost always rideable, even right after a big storm. However, it can be pretty mucky from the picnic table to Potrero Road.
Rosewood Trail is pretty good, but not quite as resilient as Space Mountain.
Zuma Ridge Motorway from Encinal (the bottom in Malibu is muddy)
Dirt Mulholland around Topanga State Park.
-Brown Mountain Fireroad
-Most San Gabriel Mountains trails made up of decomposed granite
-Beaudry Fireroad
-Hostetter Fireroad
-Mt. Lukens

Ken Burton Trail Restoration Day 4

Friday, December 18th, 2015

Ride in 8 miles and 2000′ to the work site

On Sunday, December 13, more than 25 CORBA and Mount Wilson Bicycling Association volunteers came out to help restore the Ken Burton Trail. It was another highly successful day, with another quarter mile of trail brushed, re-cut and restored back to better-than-before-the-fire condition. Following much the same pattern our previous trailwork days have followed, our lead crew rough-cleared brush to reveal the old tread. Others followed with loppers to fine tune, then mcleods and pulaskis to remove the years of accumulated slough and restore outslope and drainage to the tread. We worked on approximately a quarter mile of tread, including the first three (of more than 20) switchbacks, and began prepping the trail beyond that.

first switchback on Ken Burton trail

First Switchback finished on Ken Burton

Our crew was excited to have John Watson from The Radavist join us with a crew to shoot video and photos of our day’s work. They did a great story and photo gallery, available at: http://theradavist.com.  Click on the photo to scroll through their gallery of great shots.  They also put together a great video capturing the day’s efforts.

Our next work day, weather permitting, will be on January 10, followed by January 24.  Sign up to our event on Meetup.com/corbamtb, or on Facebook.

 

 

 

Ken Burton Trail Restoration Continues December 13

Wednesday, November 25th, 2015
MWBA and CORBA Trail Crew

Most of the Sunday, 11/22 crew after they arrived. Thanks guys and gals!

On Sunday, November 22nd, 2015, we had our third full trail restoration work day on Ken Burton trail with the Mount Wilson Bicycling Association. 23 volunteers made the 7 mile, 2000′ climb to pitch in. Bob trailers were used once again to get needed tools and supplies to the work site.

We continued on from where we finished last time. The crews worked feverishly for a solid four hours, clearing an additional 1600′ of trail. We’re making rapid progress, thanks in part to the excellent original construction by the Mount Wilson Bicycling Association in the 1990’s.

 

Ken Burton Hike a Bike

Before: A group who poached the closed trail in 2013. The brush is only thicker and taller now.

 

Completed trailwork Ken Burton

After our crew had been through

 

Ken Burton Trail Restoration

After: looking the other direction

The before and after is quite dramatic. Where the trail was previously completely obscured by brush, it is now in better shape than before the fire. Our crews are getting it down to a fine art. We’re using power hedge trimmers for the initial brush clearance, followed by swampers (who remove and stash the cut brush), then loppers and hand saws to fine tune the brush and stump removal.  The lead crew is followed by a tread crew, working to remove stumps and roots from the tread, and pull down slough to restore the original trail tread.  We’re cutting the trail to its original 36 – 48″ tread width where possible, knowing that it will narrow down again with time.

Ken Burton Trailwork

Getting close to the memorial and the top of the switchbacks

 

Ken Burton Memorial. Plaque has been long gone.

Ken Burton Memorial. The plaque is long gone.

Our target for the day was to reach the Ken Burton Memorial, a plaque dedicated to USFS Battalion Chief Ken Burton, who was killed in a car crash in November 1985. For those who remember the trail, the memorial was just before the very first switchback descending into the Arroyo Seco canyon. We made it to the Memorial at about 1 p.m., leaving time for people to gather tools, load up trailers and ride back down for lunch at 2. Pat Phillips, a local Altadena resident and one of the original construction crew in the 1990’s, graciously hosted us for lunch afterwards.

Failed wire basket retaining wall

Failed wire basket retaining wall

 

We’ve also reached the first failed retaining wall structure. In my survey of the trail, only two sections of retaining wall structure failed out of the dozens used, a testament to the work of the original MWBA crew. Those dozens of structures have survived three major El Nino winters and one Station Fire.

Completed-Map

Project Status. Click for a larger view.

So far we’ve cleared approximately .7 miles of the trail, about 1/3 of the work. We have a couple more days of very similar work before it will get especially thick and tough near the bottom. At that time we’ll need to coordinate with the Los Angeles Conservation Corps who are working on the Gabrielino trail, near where it meets the bottom of Ken Burton trail.

Thanks again to all the volunteers who came out to help. Our next work day is December 13 (weather permitting). Our tentative dates starting next year are January 10 and January 24, to be confirmed soon. The more people who contribute, the better our chances of riding this trail next summer!

 

Ken Burton Trail Restoration Has Begun

Tuesday, November 10th, 2015
The Ken Burton trail goes right up the middle of this picture. It's hard to find.

The Ken Burton trail goes right up the middle of this picture. It’s hard to find.

Earlier this year, CORBA used a generous grant from REI to help fund the restoration of the Gabrielino trail to Oakwilde Campground and the Ken Burton trail junction. Pooling resources with the Los Angeles Conservation Corps, CORBA helped fund a private contractor, Bellfree Contractors, to oversee volunteers and Conservation Corps crews, taking the lead on the project. The trailwork needed was so extensive it required the review and approval of Forest Service staff engineers. Much of the trail was completely gone, having been swept away in a massive landslide, or gouged into a ten-foot-deep, twelve-foot wide gully where once you could step over a trickle of water as it crossed the trail. That work was begun last spring, and Los Angeles Conservation Corps continue to work on the Gabrielino in the area. The Trail remains closed to the public beyond Paul Little campground/Brown Mountain Dam while restoration efforts continue.

Meanwhile, we were given permission to begin work on the Ken Burton trail earlier in summer. Work began in October with the trail being inspected, and in many cases searched for using older GPS tracks, by CORBA volunteers.  On Saturday, November 7th six volunteers came out to begin work on the trail. Just getting to the work site requires a 2000′ climb over 7 miles, with several steep, loose sections that are difficult without carrying tools. In one day’s work, we were able to clear brush from about a quarter mile of trail, and restore tread on just over half of that. The tread, once cleared of brush, is generally filled with loose slough that’s easy to clear, but is otherwise intact. A few retaining wall structures near the top have failed and will require digging out the old materials–iron posts, steel mesh, wire and screen–and replacing them.

After 7 miles and 2000', the crew arrives with tools in tow

After 7 miles and 2000′, the Saturday crew arrives with tools in tow

On Sunday, November 8, we worked with the Mount Wilson Bicycling Association’s and had a crew of about 18 come out to begin work. Several volunteers stepped up to haul bob trailers full of tools, no easy feat with over 2000′ of climbing. With hedge clippers doing the initial clearing, followed by a rake or Mcleod to clear the cut brush, followed by a loppers and pick-mattocks to pull roots, and finished off with a nice outsloping by Mcleod, we had it down to a system. The brush on day two was much thicker than the day before, but we were able to clear about another quarter mile of trail, and with the extra hands, do another quarter mile of basic treadwork.

Ken Burton trailwork

Brush was thick and the trail difficult to find in places.

After both days of trailwork the crews enjoyed a great meal and some local hospitality. Many thanks to everyone who came out for the work. This trail is special to many people, having been built by mountain bikers, the Mount Wilson Bicycling Association, in the early 90’s. Special kudos to Brad, Burt, Mike, Robin, and Steve who came out both days!

20151107059-Ken Burton Trailwork

We left almost a half mile of the trail looking like this in one weekend.

We’ll be back out on the trail this Sunday, November 22, again with Mount Wilson Bicycling Association. And if there’s enough interest (and the weather/fire danger cooperates), another crew could head up on Saturday instead (or in addition!). At the moment, we’re approaching capacity on Mount Wilson Bicycling Association’s Facebook Event. For that reason this weekend’s trailwork isn’t being added to CORBA’s meetup calendar. However, a tentative third weekend on Sunday, December 13 is in the works. Stay tuned for details. The Forest Service requires our volunteers to wear long pants, long sleeves, gloves and hard hats which we supply (and with the thick brush, all that gear is a good idea). These can be carried up in backpacks for the ride up and changed into before we start work.

2015-11-08 13.11.00

Some of the crew prepare to head back down after a solid days work.

Ken Burton trail is closed to the public. Although we’ve started on it, it’s still dead-end with miles of hike-a-bike through heavy unrideable brush and poison oak once you get beyond our short restored section. People have gotten lost trying to find the trail. We’ll continue working on Ken Burton through the winter and coming Spring, with the goal of having it, and the Gabrielino back to Paul Little and JPL, ready to open by the end of Spring 2016. The more involved you stay, the more likely the Forest Service will open the Brown/Burton/Gab loop, an old favorite of many long-time mountain bikers.

How we get it done. Bob trailers can haul tools for six people.

How we get it done. Bob trailers can haul tools for six people.

 

Photos and Report on Backbone Trail Restoration on Oct 31, 2015

Saturday, October 31st, 2015

On Hallowe’en day, 16 CORBA volunteers along with a half dozen from the Santa Monica Mountains Trails Council hiked up the Backbone Trail from Mulholland Hwy towards Etz Meloy for the third time in a year to cut back the overgrowing brush and improve the drainage.

IMG_1174It seems like all mountain bikers love this 2.5-mile long trail that twists and meanders, climbing gently and constantly up 600′ vertically.

I had hoped that we would have enough people to complete the brushing along its entire length, and the word is we succeeded – almost! There is still one very small gap that hasn’t had the brush cleared, but that section of the trail isn’t badly overgrown.

The CORBA crew focused on cutting back the brush, but the SMMTC crew also worked on the tread – cleaning and fixing the drains and spreading the slough across the trail to level it out. (Slough is the dirt that falls onto the inside edge of the trail from the hillside directly above, resulting in a narrowed trail because people don’t ride or hike on the uneven and loose slough.)

The CORBA volunteers included five students from Calabasas area high schools mountain biking teams, and two of their parents. The teams like their members to give back to the trail community. These kids did a great job helping to restore the trail, as did all the volunteers. Thanks for your help; everybody who uses the trail will appreciate your work when they don’t get scratched up from the brush that used to grow into it!

You can view photos of the work at our trailwork day photo gallery.

Help restore Ken Burton Trail, Nov 7, 8

Thursday, October 29th, 2015
The trail is heavily overgrown

The trail is heavily overgrown


We have been waiting for some time to begin work on the Ken Burton trail. This much-loved trail was built by the Mount Wilson Bicycling Association in the early 90s, creating a loopable route with Brown Mountain and the Gabrielino Trail. CORBA used a generous grant of $10,000 from REI to help fund the restoration of the Gabrielino Trail from Paul Little to Oakwilde Campground. We coordinated with the Los Angeles Conservation Corps who continue to work on the segment north of Oakwilde this fall.

CORBA and MWBA have been given permission to work on Ken Burton, and to connect it to the restored section of the Gabrielino. Once completed, we’ll be asking the Forest Service to open the Brown, Ken Burton, Gabrilieno loop route to the public.

We have scheduled a work weekend on the 7th/8th of November. Logistics require us to haul in tools and equipment by Bob Trailer. Most of the two days of work will entail cutting back brush. Surprisingly, much of the tread is in good condition, and most of the switchbacks appear to be generally intact. This says a lot about the quality of construction by the MWBA’s pioneers and their dedication to quality trail building. Only a few wire baskets have failed out of the many that were used.

Please RSVP for the trailwork on our meetup group at http://meetup.com/corbamtb or on the MWBA Facebook page.

IMPORTANT:

When: Meet Saturday, November 7, 2015, 7:30.a.m. Windsor and Ventura parking lot.  Ride up to
the top of upper Brown Mountain fire road starting at 8, and meet there at 9:15. We’ll work until about 1 p.m before riding back down.

Sunday, November 8, 2015, meet at 7:45 a.m. at Windsor and Ventura Parking lot. Ride  up at 8 a.m..

You may come out for either or both days.

What to bring:

Eye protection (cycling style sunglasses are fine), work gloves (if you have them), sunscreen, water and trail food, sturdy shoes. You are required to wear long pants and long sleeves, though these can be packed for the ride up and changed into at the top. We’ll be supplying forest-service required hard-hats, gloves and tools. A GMRS radio could also be helpful.

What to expect:

Experienced trail crew members will be using power tools (hedge trimmers, etc) to clear brush; others will clear the cuttings from the trail and do minor tread work. You’ll need to sign a waiver for CORBA, and a Job Hazard Analysis for the Forest Service. If under 18, be accompanied by a parent or guardian, at least to sign the waiver before we start, and assign a guardian who will be with us. People should be familiar with the ride up and the location. Those hauling trailers are welcome to take off early, and they can be briefed on safety at the top.

The ride in will be about 7 miles with 2000′ of elevation gain on a mix of fire road, double track and singletrack. Expect to ride all the way up, though there’s a few possible hike-a-bikes. We expect everyone to be at the upper Ken Burton trailhead by 9:15 and ready to hike down the trail and begin work.

We’ll be clearing brush, removing vegetation growing on the tread or leaning over the trail corridor, approximately 4 – 5 feet either side of the center of the tread. There will be some tread repair in a few places where the trail bench cut has been filled with slough, and some light tread grooming over other areas. We’ll break at about 11, take an assessment of how everyone feels and see who wants to continue. We hope to finish work about 1, and be heading back to our bikes for the descent back to the bottom.

Afterwards, those who wish may join us for lunch at a location to be announced.

Those hauling bob trailers should understand what an extra 50 pounds feels like on a ride like this, and have something left over to do trailwork. If you’re interested in hauling a trailer (a smaller chainring is helpful) post in the comments or contact Steve [at] corbamtb.com.

Severe weather cancels the event, including heavy rain, high fire danger and/or high wind, or other circumstances. Check CORBA’s pages on either Meetup or Facebook before you head out just to make sure that we’re still on.  November 15 will be a backup day in case of weather cancellation.

We hope to see you there showing how much you love and miss our trails and that mountain bikers are one of the most active stewards of the trails.

 

20151015006-Ken Burton Trailwork Scouting

Typical trail conditions

 

Building a new trail in Wildwood Park during the COSCA Annual Trailwork Day on Oct 17, and photos

Monday, October 19th, 2015

IMG_0816163 volunteers, including 16 from CORBA, built 3/4 miles of new trail, and an alternate access to the bottom of the Lizard Rock Trail in Wildwood Park in Thousand Oaks, for the COSCA (Conejo Open Space Conservation Agency) Annual Trailwork Day. The new trail bypasses the steepest segment and has a better view because it faces more to the west, away from the Hill Canyon water treatment plant.

Volunteers started arriving at Santa Rosa Valley County Park shortly before 7:30, registered and picked up their package of goodies before getting on one of the shuttles that took them 1.3 miles to the trailhead. There they formed into crews of ten or so, each with it’s own experienced crew leader, grabbed tools and hiked up the trail to the work area. Once there, the crew leaders explained to the other volunteers what the work would be, how to use the tools effectively to accomplish that, and above all, how to work safely so there wouldn’t be any injuries.

IMG_0841Most of the new trail was across a steep slope so our job was to dig out the dirt to form a nearly level trail tread. The brush had previously been cut back and the exact path of the trail marked by bright orange flags so we would know where to dig. The area that my crew was working happened to have relatively few rocks mixed in with the dirt so the work went very quickly, but most of the other crews had a lot of rocks to dig out. The most time-consuming part of the work was pushing the excavated dirt far enough down the hill from the trail so that it would be clear to visitors that it wasn’t part of the firm trail tread.

Steve Messer, president of CORBA, takes trailwork seriously!

Steve Messer, president of CORBA, takes trailwork seriously!

My crew finished our section in about an hour and a half, so we moved down to the bottom of the trail to help there. The work was the same but went quite a bit more slowly because we had a lot more rocks to deal with and we weren’t as fresh as at the start. But as other crews finished their sections, they came down and pitched in too. Overall, we got the trail finished about a half hour sooner than planned for.

Everybody headed back to Santa Rosa Valley County Park, either by shuttle bus or on foot, for the barbecue that the COSCA rangers famously prepare for the volunteers every year. The lunch was followed by a give-away of trail-related items, the most significant being a new mountain bike donated by Giant Bicycles in Newbury Park. Both the lunch and gifts were to thank the volunteers for their hard work.

The COSCA rangers are cooking up a smokin' barbecue lunch for the volunteers!

The COSCA rangers are cooking up a smokin’ barbecue lunch for the volunteers!

All the volunteers did a great job! Besides CORBA, there was a strong representation from the Santa Monica Mountains Trails Council, high-school mountain bike teams from Newbury Park and Calabasas, several Meetup groups, geocachers and others organizations. It takes the support of these organizations and the participation from the volunteers to make the trailwork day the success that it always is. I know COSCA appreciates their effort and we at CORBA heartily thank everybody for their contributions!

You can find more photos of the event at our photo gallery of the 2015 trailwork day.

 

 

In addition, two videos have come to light of this workday,
from geocacher GSXM2: https://youtu.be/RCErrPdANUA
from chillinconejo.com/: https://youtu.be/7deSC-FfvMw

 

Third (and final?) restoration day on the Backbone Trail between Mulholland and Ezt Meloy to be Oct 31

Monday, October 19th, 2015

On two previous occasions in the past year, CORBA and the Santa Monica Mountains Trails Council crews have teamed up to tackle overgrowing brush and drainage issues on the section of the Backbone Trail that climbs from Mulholland Highway to Etz Meloy Fireroad. This 2.5-mile long sections is a favorite for mountain bikers because of the gentle grade, swooping turns and great views of the Malibu coastal area.

With the heavy rains that El Nino is expected to give us this year, we really would like to get this trail finished to prevent water erosion damage. And we could use lots of help from volunteers!

For details and to register so we’ll know how many people to plan for, please visit our Meetup trailwork signup page. Remember, CORBA will take you to lunch afterwards to thank you for your help!