Archive for the ‘Regions’ Category

More Work Scheduled for Sullivan Canyon in June

Wednesday, May 28th, 2014

Since 1960, Southern California Gas Company (“SoCaIGas”) has owned much of the land that comprises Sullivan Canyon (more than 4 miles in length).  This property is used as a corridor for two transmission pipelines that provide Los Angeles residents with a safe and reliable supply of natural gas.  Periodically, SoCalGas must perform maintenance on these pipelines. The purpose of this letter is to provide information on pipeline maintenance and repair work that will occur in the coming weeks.

SoCalGas will conduct a hydrostatic pressure test on a segment of one of our natural gas transmission pipelines in Sullivan Canyon.  Hydrostatic pressure testing is a process that uses water to exert pressure on a pipeline at levels greater than its usual operating pressure to assess its soundness, often referred to as its integrity.

This test involves digging around the underground pipeline and safely venting natural gas from the pipeline. We will then fill the pipeline with water, and increase the pressure to a level that is higher than the pipeline’s normal operating pressure.  If the pipe holds the pressure without any leaks, it will be put back in service. If the pipeline leaks during the test, SoCalGas will repair the pipeline and retest it, or replace it with new, pre-tested pipeline.

What to expect

The construction work will take place at several locations starting west of the Sullivan Canyon trailhead at the end of Queensferry Road and about a quarter-mile northwest of the trailhead.  Work will begin in June 2014, and last about four to six weeks, although weather and other factors affecting safe working conditions could change the schedule. Normal work days will be Monday through Friday 7:00 a.m. to 7:00 p.m., however, some activities may extend the hours.

Test Start Location:

At Sullivan Canyon Trailhead at Queensferry Road, a test-start location will be staged just west of the trail with an excavation site, water tanks, and other equipment. This area will be closed to the public.

Test End Location:

About a quarter-mile northwest of the trailhead, a test-end location with excavation site and support equipment will be staged alongside the trail.  This area will also be closed to the public.

Hikers, bikers, and others traversing the trail should use caution while passing by both test site locations. For safety reasons, Sullivan Canyon Trail will not be accessible by the public on the actual test day for the duration of the test. Check local signage with updates on construction activity.

The local community may notice truck traffic bringing test equipment and water tanks to the test sites and then removing them. Nearby residents may hear some work-related noise.

Your gas service should continue without interruption. If that changes, a SoCalGas representative will contact you.

The odor of natural gas

At times, you may smell the odor of natural gas and hear a loud, steady noise as we vent natural gas from the pipeline using safe and common techniques. Although this is normal when crews are working, we encourage anyone who has concerns about the smell of gas to call us from a safe location at 1-800-427-2200. We are available 24 hours a day, seven days a week.

We apologize for any inconvenience while we’re performing this test and appreciate your patience and cooperation.

Mike Harriel

Public Affairs Manager – Southern California Gas Company

Tel: (213) 244-4633 

Station Fire Closure to Expire, Strawberry Peak Loop Opens

Friday, May 23rd, 2014
Station fire damage to Strawberry Peak trail

Station fire damage to Strawberry Peak trail

The Station Fire burned over 250 square miles of the Angeles National Forest in 2009. The most recent Station Fire Closure Order went into effect on May 25 last year, and is in effect until May 24, 2014.  The Forest Service will not be renewing the general closure order. Instead, some trails that have yet to be restored will remain closed, along with some higher elevation fireroads. This is both for public safety and additional resource protection and recovery.

The following trails will remain closed:

  • Strawberry Peak Trail 12W05.1 (From the junction with Colby Canyon trail north to Upper Big Tujunga)
  • Lower Gabrielino Trail 11W14 (between Bear Canyon trail junction and Paul Little Campground)
  • Ken Burton Trail 12W19 (the complete trail)
  • Millard Waterfall trail (a non-system user-created trail)
  • Barley Flats Trail
  • Santa Clara Divide Road 3N17 (between Alder Saddle westward to the intersection with the BPL road near North Fork Station)
  • Axial roads that connect to the closed portion of 3N17 will also remain closed:
    • 4N32 (BPL Road) between 3N17 and 4N33
    • 4N33 (Moody Truck Trail) between 3N17 and 4N32
    • 4N24 (Beartrap Truck Trail/SCE Service Road) between 3N17 and Aliso Canyon Road
    • 3N90 (Roundtop) between 3N17 and Roundtop Peak
    • 3N32 (Mendenhall Ridge Road) between 3N17 and Indian Ben Saddle

Additionally, the following campgrounds will remain closed:

  • Messenger Flats Campground
  • Lightning Point Campground
  • Big Buck Campground

Note that some media reports have indicated that the Colby trail would be closed, without specifying which segments. Rest assured that the segments of the Colby Canyon trail that comprise the classic “Strawberry Peak Loop” will be opened. The segment of Colby Canyon trail north from Josephine Ridge to Highway 2 is still in very poor condition and not recommended for bicycles, though it will be opened.

Strawberry Peak after restoration

Strawberry Peak after restoration

We must acknowledge once again the generous support we received from REI to help fund the professional services of Bellfree Contractors, tools and food for volunteers, that allowed us to complete the restoration of the Strawberry Peak Trail. The restoration effort included a re-route of a particularly troublesome section, which was planned out as a part of the IMBA Trail Care Crew visit in 2012. We coordinated our efforts with The National Forest Foundation, Los Angeles Conservation Corps, and the Sierra Club Angeles Chapter trail crew. And of course, our biggest thanks go to the many volunteers who came out to our trailwork days on Strawberry Peak. We’ll be doing more trailwork there as we continue to maintain the trail in the future.

The Gabrielino Trail will be our next focus, and stay tuned for important news regarding that effort. We must emphasize that the closed segment of the Gabrielino trail is not ready for public use. At least three groups of trail users who ignored the closure have had to be extracted by Search and Rescue. Please stay off the closed trails listed above for your own safety.

 

 

Malibu Adventure Games May 17

Friday, May 2nd, 2014

MAG_5x7_2014The Malibu Adventure Games return to Malibu Creek State Park May 17 with added mountain biking activities. Along with a poker ride with two different distances, there will also be a family blackjack ride where participants can win prizes by beating the dealer at various stations. CORBA’s Mark Langton will also be providing a free skills clinic prior to the poker rides.

Also at the event will be activities for the whole family including a climbing wall, nature walks, kids XTERRA 1-mile fun run, yoga classes, and a fitness expo.

Also taking place during the event are  the XTERRA 22K and 6K trail runs. Proceeds from the event go to the Malibu Creek Docents to support Malibu Creek State Park. For more information go to malibuadventuregames.com.

2014 Santa Monica Mountains Trail Days Trailwork Report and Photo Galleries

Monday, April 28th, 2014
Rangers serve the barbecue on Saturday night. As well as hot dogs, there was chicken, tri-tip beef and veggie-burgers.

Rangers serve the barbecue on Saturday night. As well as hot dogs, there was chicken, tri-tip beef and veggie-burgers.

This past weekend, a large number of volunteers from CORBA, the Santa Monica Mountains Trails Council, the Sierra Club and other organizations, and individuals gathered for the 33rd annual Santa Monica Mountains Trail Days at the Danielson campground in Pt Mugu State Park. Folks could arrive Friday evening, camp overnight, help with the trails on Saturday, enjoy the barbecue dinner prepared by park staff, win some cool swag in the prize give-away during dinner, camp overnight, help with the trails on Sunday, have lunch back at the campground, then depart for home. Of course only a few people stayed for the whole weekend, but many camped for at least one night, and most stayed for the Saturday BBQ and prize give-away.

On Saturday, there were about 110 volunteers who split into five groups. The largest groups worked on Old Boney Trail in the State Wilderness Area and Sage Trail. Others went to the top of Hidden Pond Trail and youngsters under 10 cleared small rockfalls off the Sin Nombre and Two Foxes Trails. A dozen hardy souls (with hardy soles) hiked almost three miles (and up about 1400′) carrying tools to work on the Chamberlain Trail, also in the wilderness area.

The group of about 30 volunteers who worked on Sage consisted of CORBA folks, a few geocachers, and others. The trail had just been SWECO’d (plowed by a small trail-sized bulldozer) to level the trail, smooth out the ruts, and narrow it. The trail is narrower now because it used to be the full width of a fire road, and now the travel surface is about half as wide. The SWECO is only able to get so close to the edge, so the work consisted of pulling down the berm (pile of dirt) the machine left at the outside edge of the trail, sloping the trail about 5-degrees to the outside so rainwater will run off, rather than down the middle, and removing the larger rocks.

Putting the finishing touches on the Sage Trail on Saturday after it was leveled, smoothed and narrowed by the SWECO trail bulldozer.

Putting the finishing touches on the Sage Trail on Saturday after it was leveled, smoothed and narrowed by the SWECO trail bulldozer.

There were also a few spots of severe erosion and rutting on the side of the trail where rain water had run off, taking some of the trail with it. In one case, the erosion extended about half-way into the trail. To prevent future rain from extending these ruts and eventually washing the trail away completely, we built rock walls down the ruts to reinforce the side next to the trail. The idea is that the water will run off the trail and down the rock wall, protecting the dirt underneath from being washed away. The rocks will also slow and disperse the water, so it doesn’t wash away the dirt below the wall and undermine it.

Overall we worked about 2300 feet of trail, from the bottom to where the now-closed Art’s Trail joins it.

We headed back to the campground at about 2:00 pm, although crew leader Virginia from the Trails Council stayed about a half hour longer, and CORBA’s Steve Messer stayed even longer. Some people just won’t quit until the job is finished!

We always have a much smaller group for the Sunday work day, so all 30 of us returned to Sage Trail to finish off the top 1700′. It only took until about noon to get this shorter section completed.

Sage Trail is a little loose after our trailwork, but it’s not too loose to ride. It should be packed down in two or three weeks, as Guadalasca Trail was after we did the same work there last spring. The trail will also regain its single-track width after enough people have ridden it to define a preferred course.

CORBA, the Trails Council, local chapters of the Sierra Club, California State Park, the National Park Service and other would like to give a tremendous Thank-You to all the volunteers who helped over the weekend, both working on the trails to keep them in top shape, and organizing and coordinating in the camping and registration area!

You can view more photos of the trailwork in the Saturday photo gallery and the Sunday photo gallery.

Join the Danusia Taber Memorial Ride May 31st

Friday, April 18th, 2014

Please join us for the 1st annual Danusia Taber Memorial ride at MCSP (Malibu Creek State Park) at 9AM on May 31st. This ride will be to honor Danusia Taber who passed away in May of 2013 of Leimyosarcoma, a rare cancer. This is also a fund raiser ride for the Sarcoma Alliance the non profit that helped Danusia in her time of need. Please donate prior to the ride in Danusia’s Memory here: http://sarcomaalliance.org/donate/donate-now/

You can also bring cash or a check made out to The Sarcoma Alliance and turn it into me at the Memorial site at 9am.

Danusia was instrumental in getting GGR off the ground. She was there from the beginning with direction, motivation and helping with partnerships such as CORBA. She was a CORBA board member, an MBU patroller, a mentor and great friend to many. Before she passed, she approved the Danusia Bell program. These are small bells to place on your bike or pack alerting other trail users you are there. 100% of these profits also go to the Sarcoma Alliance per Danusia. You can purchase your Danusia bells here: http://www.girlzgoneriding.com/ggr_products/
or here: http://corbamtb.com/store/store.shtml.

Danusia riding on the Wood Canyon Trail in Pt Mugu State Park

We will have 3 levels of rides:

• Beginner & Advanced Beginner: Riding to the dam and back: about 8 miles

• Intermediate: Short Bull dog loop & Grasslands: about 15 miles with 1500 feet of climbing

• Advanced: New Millennium Loop & Grasslands: about 19 miles with 3400 feet of climbing.

All riders will meet at the Memorial spot at 9am to have a brief revisit of Danusia’s life and why we are there for her and the fund raising efforts. If you have a story to tell about Danusia, I will open up the area to anyone who does. We would love to hear it! She was a character and we all have many great stories!

Please meet at the SOUTH end of Mott Motorway where the memorial service was held last year:  http://www.venturacountytrails.org/TrailMaps/MalibuCreek/AreaTrails.htm#Map. Mott is #7 on the Map.

You can further show your support by signing up for this event on our Meetup group here http://www.meetup.com/CORBAmtb/events/153915552/ and encouraging all your friends to come along!

If you have any questions on the event or ride, please contact Wendy Engelberg: wendy@girlzgoneriding.com

I thank you so very much in advance for supporting this event. GGR Girl and Proud CORBA member Wendy E

April Skills Clinic photos published Saturday, April 5

Saturday, April 5th, 2014

The April 2014 Skills Clinic Skills Clinic at Malibu Creek State Park, on a sunny but cool day, was made up of 25 riders. There was a small amount of water in the stream crossing this month, but we didn’t ride across because of the large number of hikers wandering back and forth. Maybe they were looking for tadpoles. So we didn’t get a chance to ride through the stream yet again. You can see the April photos in the April 2014 photo gallery.

Strawberry Peak Restoration Update

Wednesday, April 2nd, 2014
Station fire damage to Strawberry Peak trail

Station fire damage to Strawberry Peak trail

Strawberry Peak is one of the most loved areas in the Angeles National Forest. It suffered devastating damage during the El Niño storms following the Station Fire. After the fire the trail was impassable and has remained closed to all users, even as much of the surrounding burn areas have opened up.

The Strawberry Peak and Colby Canyon trails together comprise the classic Strawberry Peak Loop. CORBA and the Boy Scouts have worked to restore the Gabrielino trail, the third leg of the classic loop, over several trailwork days since the Station Fire. It is open and in good shape.

During our initial surveys of Strawberry Peak trail, it became clear that one particularly problematic section of the trail could benefit from a complete re-route. This section, where the Strawberry Peak trail leaves the old Barley Flats fire road, is a fall-line rocky chute that was difficult to ride even before the fire. After the fire, it became a 4′ deep rocky rut for most of its length. Trail users (who should not be in the closed area) have been steadily widening this section of trail as they go around the ruts and rocks.

Restored Strawberry Peak trail

Restored Strawberry Peak trail

CORBA planned the re-route during our IMBA Trail Care Crew visit in 2012. About 30 class attendees and volunteers worked on the trail and learned how to flag out and prepare a new trail route. The re-route plans were submitted to the Forest Service for environmental review. The review process took about six months. We were required to power wash tools, among other things, to avoid spread of invasives. (CORBA’s tools are used in many different jurisdictions in Southern California).

In late 2012, CORBA received an REI grant of $10,000 for the restoration of the Strawberry Peak loop. We purchased some new tools, and fed volunteers on our trailwork days, and sought professional help. The National Forest Foundation funded the Los Angeles Conservation Corps for this and several other Station Fire damaged trails. Together, we solicited the services of Bellfree Contractors, a professional trailbuilding company, to restore many of the larger slide areas, burned sutter walls and downed trees. CORBA also paid over $2500 of our discretionary funds for professional trailbuilding services. We coordinated with the Sierra Club volunteer trail crew who also worked on the Strawberry Peak and Colby Canyon trails.

strawberry peak trail crew Volunteers, February 16, 2014

Volunteers, February 16, 2014

On February 16, CORBA had 22 volunteers come out for trailwork. We rode or hiked in the 3 miles to the Strawberry-Lawlor saddle, and worked on the trail as far down as Strawberry Springs. Those who rode or hiked in were very happy to be back on the closed trail. We accomplished a lot, clearing about .6 miles of trail, building three rock retaining walls at drainages, cutting and widening the trail bench, and removing slough.

The LACC and Bellfree Contractors had cleared and restored much of the Colby Canyon trail from Josephine Saddle to the Strawberry Potrero. After their work, it was in better shape than before the fire.

On March 16 we returned with about 17 CORBA and MWBA volunteers. We rode in 2.5 with Bob trailers about 2.5 miles, and restored the trail all the way to Strawberry-Lawlor saddle. With the re-route completed, the ride in was much better. There was poodle dog to remove, and slough from the one big winter storm of 2014. 

We will return to the trail during May, date TBD. There is still work to be done, including the repair of composite retaining walls, brushing and the ongoing need for routine maintenance.

With CORBA, Mount Wilson Bicycling Association, Sierra Club, Los Angeles Conservation Corps, National Forest Foundation and a professional contractor working together, the Strawberry Peak loop restoration has been progressing nicely.

Riding in to trailwork with Bob trailers

Riding in to trailwork with Bob trailers

The Station Fire Closure order is in effect until May 24, 2014. The Forest Service is assessing the burn area and the trails to determine whether to renew the closure order, modify it, or let it expire. The section of the Strawberry Peak trail north to Upper Big Tujunga Canyon needs a substantial re-route, planning for which has begun. Even if the Forest Service lifts the closure, we expect the Strawberry Peak trail from the junction with Colby Canyon trail north to Upper Big Tujunga to remain closed, or be subject to a seasonal or temporary closure. Because of the need for a re-route, this section of the trail has not yet been worked on.

CORBA would like to thank all the volunteers who came out to our trailwork days; to REI for their generous grant that made the restoration and professional help possible; to the Sierra Club, National Forest Foundation and Los Angeles Conservation Corps for their efforts, and to Bellfree Contractors for their professional assistance.

 

Niner Bike Frame is Grand Prize for Trailwork Volunteers

Friday, March 28th, 2014
Could it be YOU who wins a frame like this Niner?

Could it be YOU who wins a frame like this Niner?

As part of the thank-you for volunteers who help with maintaining our trails in good riding order, CORBA has been giving away mountain biking swag at the end of each event. To speed things up on trailwork days, and to allow some really great  (ie, expensive!) prizes to be given away, we will instead have a drawing at the end of the year for all the volunteers who come out during that year.

We have a Niner frame waiting for some lucky volunteer, plus other great prizes including grips and saddles from Ergon!

In order to be eligible for the drawing, volunteers must register for events in advance on our Meetup group, show up at the event and sign the standard waiver form. At the end of the year, we’ll go back through all the Meetup events and count the number of times each volunteer helped out. Everyone will get one chance in the drawing for each time they participated.

Now by helping to keep our trails in good shape, you will have the satisfaction of knowing that you’re giving back to the trails community, of contributing to the enjoyment that others have in our open spaces, and also having a chance at scoring a sweet ride from CORBA and Niner!

Good luck and thanks for helping out!

Santa Monica Mtns Trail Days at Sycamore Canyon Apr 25-27

Wednesday, March 26th, 2014

SMM Trail DaysOnce a year we have an opportunity to work on the trails and then BBQ and camp at Danielson Ranch in Pt Mugu State Park. It is opened annually for the Santa Monica Trail Days! This is a unique opportunity to work on the trails that we enjoy so much in Sycamore Canyon, and the Saturday workday is followed by a BBQ and prizes, with free camping available on Friday and/or Saturday night. This is hands down the best day to get in some trail maintenance work! Camping is optional; you may leave with the escort after the BBQ. There will be trailwork projects on both Saturday and Sunday. Sign up for one or both! Pre-registration is requested by April 21st so we’ll know how many people to prepare for.

Schedule at a glance

Friday night April 25 – arrive for overnight camping (optional). Bagels and hot beverages supplied Saturday morning for campers.

Saturday April 26Trailwork, barbecue dinner, prize give-away. Bring your own lunch. Optional overnight camping. Bagels and hot beverages supplied Sunday morning for campers.

Sunday April 27Trailwork, prize give-away. Bring your own lunch.

You can volunteer to help out on Saturday, Sunday, or both.

BRING: LUNCHES, BEVERAGES, SNACKS AND WATER. Tools and instruction on using them are provided.

WEAR: Gloves, hat, long pants, protective clothing, and work boots or sturdy shoes.

REGISTRATION: Advance registration is required for the activities shown below, and appreciated by April 21st!

Saturday Registration: http://www.meetup.com/CORBAmtb/events/173599122/
Sunday Registration: http://www.meetup.com/CORBAmtb/events/154204972/

TRAILWORK: Saturday and/or Sunday. Help out with one or both! There are also opportunities to help out in the camp instead of trailwork.

CAMPING: Free camping Friday and/or Saturday nights for volunteers at the Danielson Multi-use Area located under the sycamores and oaks in the heart of Point Mugu State Park. Bring your own gear.

DINNER: Sat. Night Barbecue Free FOR VOLUNTEERS. Bring appetizers and beverages.

PRIZES: Thank-you prize give-aways will be held Saturday after dinner and Sunday after trailwork.

VEHICLE ACCESS: You will be able to caravan into and out of the park by vehicle only at these few designated times:

ARRIVE: Friday – 5 pm and 7 pm Saturday – 8 am and 4:30 pm Sunday – 8:30 am

DEPART: Saturday – 4 pm and after campfire Sunday – 8 am and 2:30 pm

Full details and camping/dining details are also provided on the registration pages.

COSCA Spring Trailwork Report, Photos and Video from March 22

Wednesday, March 26th, 2014

As well as this section, there are lots of people working up above!This past Saturday, March 22, roughly 60 volunteers converged on Wildflower Park for a short hike to the work area at the bottom of the new trail. By noon, the volunteers had built the 0.25-mile long Castillo Trail that now connects Wildwood Trail in the canyon to Castillo Circle on the mesa above.

The Conejo Open Space Conservation Agency (COSCA) rangers had previously removed the chaparral and marked the route of the trail with little orange flags. It was up to the workers to dig out the dirt to make an even trail tread. The trail crossed a steep hillside, so there was a lot of dirt to be moved along much of it’s length. The route included two nearly 180-degree turns, necessitating a switchback and a climbing turn. Each of these features took 6-8 people all morning to complete.

After the work was finished, the crew returned to Wildflower Park to enjoy a barbecue lunch prepared for the volunteers.

Steve Messer, CORBA’s president, brought along his GoPro and made a time-lapse video of the trail building, and of the first ride down on his new hard-tail 29er. You can see the video on YouTube or Vimeo.

You can also view the photo gallery of the trailwork.