CORBA Mountain Biking Photos. Click on an image to see it full size.
|
The prize give-away during dinner on Saturday
|
|
|
These bones were found after the fire. They're slightly charged.
|
|
|
Cleaning up after the SWECO on Sage Trail, on Saturday
|
|
|
New rock retaining walls were built to keep water from further collapsing the trail where it runs off the side.
|
|
|
Taking a well-deserved break, on Sage Trail, on Saturday
|
|
|
Putting the finishing touches on the Sage Trail on Saturday after it was leveled, smoothed and narrowed by the SWECO trail bulldozer.
|
|
|
The prize give-away during dinner on Saturday
|
|
|
Cleaning up after the SWECO on Sage Trail, on Saturday
|
|
|
Building a rock retaining wall to keep the trail from further collapsing over the edge when water drains off it.
|
|
|
Testing the prize he selected during the give-away at dinner
|
|
|
Relaxing on Saturday before the barbecue dinner
|
|
|
Putting the finishing touches on the Sage Trail on Saturday after it was leveled, smoothed and narrowed by the SWECO trail bulldozer.
|
|
|
The youngsters worked on Sin Nombre and Two Foxes (here)
|
|
|
Preparing the barbecue dinner
|
|
|
Youngsters cleared fallen rocks off of Sin Nombre Trail
|
|
|
Cleaning up after the SWECO on Sage Trail, on Saturday
|
|
|
New rock retaining walls were built to keep water from further collapsing the trail where it runs off the side.
|
|
|
Lancelot the hawk
|
|
|
|
The prize give-away during dinner on Saturday
|
|
|
Building a rock retaining wall to keep the trail from further collapsing over the edge when water drains off it.
|
|
|
Youngsters cleared fallen rocks off of Sin Nombre Trail
|
|
|
Volunteers staying overnight at the Danielson camping area
|
|
|
Cleaning up after the SWECO on Sage Trail, on Saturday
|
|
|
New rock retaining walls were built to keep water from further collapsing the trail where it runs off the side.
|
|
|
Youngsters cleared fallen rocks off of Sin Nombre Trail
|
|
|
Putting the finishing touches on the Sage Trail on Saturday after it was leveled, smoothed and narrowed by the SWECO trail bulldozer.
|
|
|
|
Building a rock retaining wall to keep the trail from further collapsing over the edge when water drains off it.
|
|
|
The youngsters worked on Sin Nombre and Two Foxes (here)
|
|
|
The prize give-away during dinner on Saturday
|
|
|
|
Mustard is blooming after the rain a few weeks ago
|
|