Saturday, March 19, 2016, was a perfect day to do trailwork. There was moisture in the ground from the week’s rain, temperatures were cool, and the crew were able to ride to and from the work site via the Gabrielino trail. A half-dozen or so volunteers were already on their way to the work site when this group photo was taken.
Some crew members were already on their way to the work site
While several volunteers rode in via the Gabrielino, some opted to ride up to Brown Mountain and enjoy the fruits of their labor on the way down Ken Burton trail to the work site. It was the first time we had been able to ride all the way down to the 16th switchback without interruption. The volunteers who rode down Ken Burton trail were all in agreement that the efforts of the group over the previous five months had been well-worth the experience.
We were fortunate enough to have several SoCal High school league student-athletes and coaches join us for the day, along with members of the IMTBTrails.com mountain bike forum out of Santa Clarita.
This was a heavily damaged section
With the major brush work completed, the crew split into groups, concentrated on re-cutting the bench along a heavily damaged section of the trail, restoring outslope, and removing remaining roots and stubs from the tread.
Another crew worked diligently to rebuild the 16th switchback, using rock extracted from the tread to build an outside retaining wall on top of the old wire basket retaining structure that had failed. By day’s end, the switchback was completely rebuilt. We were fortunate to have the expert assistance of Hans from Bellfree Contractors on this major effort.
Rebuilding Switchback 16
By day’s end the crew had completed tread work almost all the way down to the 17th switchback, restoring one of the more heavily damaged sections of the trail so far.
So far, 81 individual volunteers have put in 1,408 total person-hours of work on this project in 14 scheduled work days, plus another 12 prep days. This is an impressive effort to restore this much-loved trail that was built by mountain bikers from the Mount Wilson Bicycling Association in the early 90s.
The next scheduled group work day on Ken Burton will be with Mount Wilson Bicycling Association on April 17, though there will be additional prep days before then. Contact Steve@corbamtb.com if you’re interested in helping prep before then (likely April 10).
On Thursday, March 3, CORBA and MWBA Volunteer Sawyers and some additional dedicated volunteers continued work on the Ken Burton trail. This time they started at the bottom of the trail, from its junction with the Gabrielino National Recreation Trail, working up the lower switchbacks through a tangle of downed trees, poison oak, overgrowth, and near-impossible wayfinding. Using chainsaws was the only viable means of cutting through the several fallen oak trees that once shaded this beautiful old oak grove. This shaded oak grove was often a popular spot to re-group after challenging oneself to clean all the switchbacks, before attempting the most difficult between there and the Gabrielino trail.
Steve Messer had spent February 20 flagging out the original trail, using a combination of GPS tracks, searching for ground evidence of dirt compaction that may still be found even after six years, and a good memory of one of his favorite trail loops.
The group made what appeared an impossible task look relatively easy, working carefully to cut brush, downed trees, and have swampers carry away and stash the cuttings. It was most gratifying to follow the string of ribbons, and find the original tread under all that brush and debris. We made it to the 17th switchback, our target for the day.
Day 13, March 13, 2016
Erik from MWBA cuts through the brush
Ten days later, on Sunday, March 13, 2016, was our 13th group trailwork day. It was especially encouraging to see that all our previous work has held up perfectly to the recent rain and storms, with no rutting, and soil being packed down nicely. The first sections we worked on last November are maturing nicely.
Our 13th worday on Sunday March 13, was a milestone day. With 21 volunteers out putting in a 7 hours or more, we were able to do a first-pass brushing on the last remaining section of trail, linking to our March 3rd work and to the bottom of the trail. This was a great milestone in this restoration project, now in its sixth month. We had cut brush from the entire trail corridor.
While the brushing tools and swampers diligently plugged away to reopen the trail corridor, the tread crew made quick work of the tread on about .3 miles of trail. With the damp dirt, cool temperatures, and sense of determination among the volunteers–many of whom have worked multiple days on this project–we had an extremely productive day.
Ryan and Stephanie work on tread restoration
There is still work to do on the 16th switchback, but it was rendered temporarily passable for the day. The last half mile of the trail is far from finished, needing a second pass with the hedge trimmers and extensive treadwork. But with some careful hike a bike the group was able to ride out the bottom of the trail, completing the loop with the closed Gabrielino trail. It was a truly gratifying day for all who made it.
We currently estimate two to three more days working on the bottom of Ken Burton trail, and an additional day on the Gabrielino trail between Oakwilde/Ken Burton and Paul Little.
We were also joined by an Ultra Distance runner, and past AC100 runner. Many trail runners are just as excited to get this trail opened as mountain bikers. During our last two days of work and long before we were finished brushing the corridor, we had hikers come up from the bottom, bushwhacking their way through until they heard us, then asking where the trail was. After reminding them the trail was closed to the public and we were working as Forest Service volunteers to rebuild it, he headed on beyond our work area for a leisurely stroll up the newly groomed segment of the trail, and all the way to Brown Mountain. People put far too much faith in outdated maps and information.
After loading up tools, the group rode out via the Gabrielino trail back to the trailhead and our meeting spot. This section of the Gabrielino trail was worked on two years ago by Bellfree Contractors. volunteers, and the Los Angeles Conservation Corps with the financial support in the form of an REI grant to CORBA, and funding from the Forest Service for the project. While the section was rebuilt, it has been two years and it also once again needs some minor work. Between Oakwilde and Bear Canyon the trail is in poor condition and almost entirely gone and unrecognizable for a long stretch. Plans are underway to continue work on rebuilding that section of the Gabrielino, once again in partnership with the LACC, USFS, Bellfree Contractors and REI.
Both the Gabrielino between Paul Little and Bear Canyon junction, and the Ken Burton trail, remain closed to the public by order of the Forest Service. Please respect the closure until the Forest Service opens the trails. We’re just as eager as everyone else to finish the project and be able to ride, but there are many steps to go through before that can happen, and it is the decision of the Forest Service as to when and if the trail will be opened.
For all the volunteers who have joined us for at least two days, we’ve ordered a special commemorative T-shirts. It’s our–CORBA and MWBA– way of saying thank you. If you haven’t put in two days, there are a few more coming up starting this weekend and in April.
Currently mountain bike advocacy is facing one of the the most important long-term issues in our history. The issue is whether mountain bikes should be allowed on trails in Wilderness areas. How mountain bikers and advocacy leaders respond to this can either be polarizing or make us an even stronger voice in the trail user and land stewardship community.
In Idaho Montana, the Wood River Bicycle Coalition, an IMBA chapter, worked with IMBA to build support for a National Monument rather than a Wilderness area. Over a period of several years, negotiations with wilderness advocates, motorized and other recreation groups and elected officials formed a broad coalition of support. However, raw ugly politics ultimately produced a Congressional designation for the Boulder White Clouds Wilderness. This was a painful and well-publicized loss to the mountain biking community. The land protection provisions they had negotiated in good faith to produce a bicycle-friendly National Monument designation were ultimately lost to a crass political maneuver to deny President Obama any semblance of a success. Congress passed a Wilderness bill and the Castle Divide and Ant’s Basin trails were closed to bikes.
Meanwhile, attorney Ted Stroll had been continuing his research into the Wilderness Act, and the congressional debates and intent surrounding that landmark legislation as it was enacted in 1964. He had concluded that the original intent was never to exclude bicycles, as a human-powered form of low-impact recreation, from Wilderness areas. Further research led him to believe that, in accordance with our constitution, we have the right to bring our grievances to the U.S. government. To do this, he formed the Sustainable Trails Coalition (STC), whose sole mission is to pass legislation that would allow local land managers to open trails to bicycles in Wilderness, and to authorize the use of machinery that would allow the most cost-effective and efficient maintenance on Wilderness trails, on a case-by-case, trail-by-trail basis.
How many mountain bikers view the wilderness ban on bikes
The timing of the Idaho defeat brought heightened attention to the STC and their focused, single-issue mission. It cast doubt in the mountain biking community about the effectiveness of IMBA’s approach of building broad partnerships and seeking compromises to both protect bicycle access, while protecting the landscapes through which we ride bikes with a mix of Wilderness boundary adjustments, cherry-stems, and alternative designations. This approach has been highly successful in many instances, but there have been some exceptions, with this loss in Idaho being the most recent and the most publicized.
Condor Peak Trail – Wilderness advocates are still proposing a Condor Peak Wilderness.
Here in the Angeles National Forest, we’ve lost access to much of the backcountry trail network on our Forest. This has placed increased use pressure on non-Wilderness trails by all user groups. Trail maintenance on Wilderness trails has come to a near-halt in many areas, and all user groups are losing those trails to nature. We don’t have any bicycle-legal singletrack options to traverse the San Gabriel Mountains north-south, or east-west, because of numerous closed trails, Wilderness designations, and restrictions on bicycles on the Pacific Crest Trail. Similarly, in the Sierra, Inyo, and Sequoia National Forests there are vast swaths of Wilderness and a few isolated areas that are open to bikes, many of which are currently being evaluated for Wilderness (and, remarkably, the folks who maintain many Wilderness trails and can’t keep up with the workload have objected to any new Wilderness.).
These Wilderness losses are very much a localized issue, affecting California and the Western States disproportionately to other areas. California has the most Wilderness areas of any state, and is second only to Alaska in Wilderness acres. Here in CORBA’s territory, we have the largest population base in the country near a National Forest. 1 in 20 Americans live within easy driving distance of the Angeles National Forest, with its five Wilderness areas and additional Recommended Wilderness taking nearly one third of the Forest.
Condor Peak Trail
Recreational activities are greatly reduced in Wilderness areas compared to non-wilderness areas, even if bicycles are left out of the equation. Maintenance efforts are greatly reduced and near-impossible for the Forest Service to schedule, as the cost of manual labor to rebuild trails (no mechanized tools allowed, even wheelbarrows) means these trails often don’t get worked on. While the same can be said of many lesser-used non-wilderness trails, this doesn’t bode well for the future of Wilderness trail recreation.
It also disproportionately affects a smaller subset of the mountain biking community who seek out, relish, and live for backcountry wilderness-type settings that can be experienced by bicycle. It’s why I started mountain biking, and what inspires me to continue exploring and experiencing these majestic landscapes. Sure, I love purpose-built flow trails, downhill trails, and our many favorite local trails. They are needed, but they don’t offer the same experience and escape that some of us live for. We need a broad spectrum of experiences and trail types to cover the many diverse reasons for which people ride mountain bikes, including wilderness-type experiences.
There have been calls for IMBA to take a stronger stand on the Wilderness access issue in print media, the blogosphere, and on social media. In fact, if you have followed closely, the amount of grandstanding on both sides of the bikes in wilderness debate has escalated. From reading some of what has been published, one could easily come away with the assumption that mountain bikers have to pick a side: either support the Sustainable Trails Coalition or support IMBA. Over the past month there have been many calls, emails and forum posts asking to cancel IMBA memberships.
Some writers in the print media have accused IMBA of taking a hardline stance against the STC, but there is much more nuance to their statements that has been overlooked. IMBA hasn’t condemned the STC or opposed their efforts. In fact, IMBA has for many months taken a neutral public policy position toward STC’s strategy, neither supporting nor opposing. Publicly, IMBA has simply stated that the STC approach is not appropriate for IMBA’s mission, given STC’s single focus, uphill battle, risks and uncertain future.
Pressure continues to mount calling for IMBA to support the STC, or at the bare minimum, take a more conciliatory stance and acknowledge the common ground that exist between the two organizations. IMBA have held a press conference explaining their position, posted an FAQ on land protection strategies they will continue to utilize, and conducted four Chapter Leader Executive Briefings with question and answer sessions with approximately 100 chapter leaders nationwide, which I attended. Many forum comments have construed their public arguments and tone as denigrating and dismissive of the STC, but in direct conversations with IMBA staff, that tone is much more nuanced.
With all this attention on Wilderness, one could be misled into thinking that this was the only issue facing mountain bikers. Admittedly, it is probably the most far-reaching issue that could fundamentally change our approach, as mountain bikers, to land protections nationwide, and especially in the Western states like California. But there are still plenty of more immediate issues and opportunities that need immediate, focussed attention, and that is where IMBA has chosen to put its limited resources and energy.
We see this “us vs. them” dichotomy as far from the case. The fact that IMBA has chosen not to support STC does not infringe upon anyone’s first amendment right to speak up for and support the STC, including us as a chapter of IMBA. IMBA’s (and CORBA’s, for that matter) plate is full with current mountain biking issues, and the vast amount of attention and resources needed to achieve the STC’s mission and focus on Wilderness access would hinder our ability to tend to more immediate threats, identify new opportunities, take advantage of current opportunities, and just get things done now.
We believe we need both organizations. STC’s single, focussed mission is to enact legislation that will allow management of wilderness trail access (and mechanized maintenance) to happen at the most local level feasible. STC is not a membership organization and as such is not structured for or able to do anything on the ground right now to open closed trails to bikes or develop and maintain positive relationships with land managers that are key to our future successes. It will be a difficult struggle and take some time before STC’s efforts may prove fruitful.
IMBA chapters are currently doing the vast majority of advocacy and access work at the local levels. If STC is eventually successful in passing their legislation it will likely be IMBA chapters doing the necessary outreach and hands-on work to give the STC’s legislation teeth, by working directly with local land managers to open trails under the authority of STC’s Human Powered Wildlands Travel Management Act of 2016 (HPWTMA).
Despite what has been claimed by the Wilderness Society and others opposed to bicycles in Wilderness, the STC bill doesn’t open ANY trails to bikes or mechanized maintenance. It allows the “most local” land managers feasible (likely district rangers and supervisors) to make those determinations on a case-by-case, trail-by-trail basis. That’s why IMBA chapters will need those strong relationships when and if the time comes.
You can bet the opposition to bikes will only get louder when that happens, both locally and nationally. It will be IMBA chapters with current, strong land manager relations that will be best positioned to follow through on any STC success. Land managers aren’t just going to open trails to bikes in wilderness areas if the STC bill is eventually enacted. If the STC bill does go through–and let’s be clear that we hope it eventually will–IMBA Chapters will need to actively engage with local land managers to open trails to bikes under the newly granted authority of STC’s legislation. Even then, those trail openings will probably require a lengthy NEPA process, and may come with restrictions. Permits, capacity limits, mandatory leave-no-trace classes, or other hurdles could be put in place as a part of that Wilderness access. Passing of the HPWTMA is just the starting point to opening trails in Wilderness.
In the meantime if people start choosing to drop support for IMBA chapters to support the STC, that will impede our ability to get things done now, such as bike parks, trail maintenance, new trails, and being a crucial voice in current land management and trail planning efforts. If CORBA/IMBA is weakened by an attrition of supporters now, it will hinder our ability in the future to build upon any STC success, and open trails currently closed to bikes by Wilderness designations.
One of the best things that STC is doing is bringing more attention to this major access issue. What saddens and frustrates us is that social media are misinterpreting some of IMBA’s responses, and turning this into an “us vs. them” situation, which will weaken our efforts on both fronts. We’d much preferred to have a more conciliatory tone from IMBA towards STC, even in the absence of outright support. IMBA has alienated a portion of their members through their statements and firm stance. That just doesn’t need to be so.
There is room–and a great need–for another group like STC to give the Wilderness issue the razor-sharp focus it will need to see through.
IMBA is a 501c3 and cannot directly lobby our government to introduce new legislation, endorse political candidates, and other restrictions. IMBA (and CORBA) are set up as 501c3 public benefit corporations, that can only influence existing laws and policies through public comments, broad-based partnerships with other organizations, and encouraging our members to speak up with their own comments and letters to elected representatives and land managers.
STC is set up as a 501c4, with the specific purpose of directly lobbying congress and our elected officials to enact change at the legislative level. They are able to do things that IMBA and CORBA cannot. It’s important to note that the Sierra Club is a 501c4, just like the STC. They have a companion 501c3, the Sierra Club Foundation, which collects tax-deductible donations that can then be used to support the lobbying efforts of their 501c4. They also operate under budgets 100 times larger than IMBA’s. Most mountain bikers are decidedly lackadaisical in their approach to advocacy–until their favorite trail is closed, or threatened to be closed. And as previously mentioned, while most mountain bikers support opening some trails in Wilderness to bicycles, the number of riders who may eventually utilize wilderness trails is likely much lower.
The mountain biking community has never had a 501c4 organization to stand behind before the STC came along. Just as the Sierra club leverages both a 501c3 and a 501c4 for various, but related, purposes, the mountain biking community has needed both a 501c3 and a 501c4 voice. As mentioned, where we see things have gone awry is that IMBA’s firm but neutral stance has been twisted and construed in social media and the blog/print media as an “us vs. them” situation.
IMBA’s approach is appropriate for IMBA. The STC approach is appropriate for STC. Together, they have brought more attention to this contentious debate, and hopefully helped engage a new cadre of concerned mountain bikers ready to advocate for continued access to trails–both inside and outside of Wilderness. Both organizations are advocating for increased trail access. They are just employing different strategies and tactics.
Let me re-iterate that in the long run, if STC is successful, strong IMBA chapters will be best positioned to make the changes that STC’s bill will authorize. We’ll then need to leverage our ongoing track record of being good land and trail stewards, and work side-by-side with local land managers to open trails in Wilderness areas. We’ll need to work hard to usher those requests through the NEPA process, and deal with the opposition to bikes that will inevitably emerge. If our voice is weakened by a lack of support now, we’ll be in a more difficult position to ask for trails to be opened under the STC bill’s authority in the future.
If STC is unsuccessful, IMBA chapters like CORBA will continue to work to make a difference, just as we have been doing for more than 29 years. We just hope to have the continued–and even increased– level of support we now get from our members.
But things at IMBA have changed somewhat. Their 2016 advocacy position clearly states that they will continue to fight more aggressively to keep trails open in the face of Wilderness proposals, wherever there are local chapters available to do the local on-the-ground work needed. They have been emboldened to take a firmer stance than ever before to prevent trail closures, within the constraints they operate under as a 501c3. Wilderness and environmental advocates are finding it increasingly difficult to pass Wilderness legislation when advocacy groups like IMBA and its chapters are directly and strongly opposed. IMBA is also investigating the merits of a legal challenge to recent trail access losses in the Bitterroot National Forest in Idaho. They have expressed a desire to legislatively adjust existing Wilderness boundaries to open trails that have been closed to bikes (without any changes to the Wilderness Act itself). But their stance falls short of lobbying for sweeping change at the legislative level, which is precisely what STC is positioned to do.
CORBA and IMBA have on a number of occasions asked for “language-based exemptions” to prohibitions on bikes on specific trails in new Wilderness proposals. We’ve usually been turned down on these requests as being “incompatible with the intent of the Wilderness Act” even though numerous language-based exemptions exist for purposes other than bicycle travel and recreation, and the STC’s contention that the “intent” of the Wilderness Act has been misinterpreted in current regulations. Yet what STC is proposing is making such language-based exemptions (or, more accurately, allowing Forest Service orders to authorize access) for bicycles and trail maintenance, an integral part of an amended Wilderness Act.
Let’s not have this issue divide us, weaken us, and allow us to be conquered. Our members can support both STC and CORBA/IMBA, and both organizations will be stronger for it. While we applaud the STC for their approach, CORBA will continue to work on efforts that have immediate, near-term benefit to all mountain bikers and our public lands: trail maintenance, management plan advocacy, currently pending bills, land manager relations, education, and stewardship.
We also hope that one day, CORBA will be in a position to ask our local land managers to open trails in current Wilderness areas to bikes, under the authority of STC’s legislation. But until then, we have to stay strong, stay united, and keep striving towards making immediate, short-term differences, happy in the knowledge that STC is working on a long-term strategy that most of our members agree would be a step in the right direction for all of us.
On Sunday, February 7, MWBA hosted a trailwork day on Ken Burton trail. With 16 volunteers, we cleared an additional .18 miles of trail. Heavy winds and dry Santa Ana conditions prevented us from using all our power tools, so progress was slower than previous days. With volunteer help from professional trailbuilder Hans Kiefer of Bellfree Contractors, three large drainages were made more sustainable using rock retaining walls, rock armoring and lots of sweat! Using rock collected on site saved the crew from having to haul in additional materials for wire basket structures. The crew restored several switchbacks, added drainage, and brushed and cleared an additional quarter mile of trail.
On Sunday, February 21st, we had fourteen volunteers come out to continue restoration efforts. The group rode to the end of upper Brown Mountain fire road, then continued down the already-completed section of the trail. Bikes were left at a convenient point, below which it would have been a strenuous climb to ride back out, especially after working on the trail. We hiked down the rest of the way to the work site.
Mitch (MWBA) and Mike McGuire were able to brush an additional .19 miles of trail with the powered tools. As we get down to lower elevations, the brush is getting much thicker, taking more time and effort to clear. The rest of the crew concentrated on outsloping, drainage and re-establishing tread on approximately .14 miles of trail. The total work day included approximately .33 miles of trailwork.
Swamping the first pass with the hedge trimmers
The last third of a mile of the trail will require chainsaws to clear the many fallen oak trees. Steve Messer, CORBA president and trail crew leader, flagged out the last half mile based on GPS tracks of the trail before the fire. Ken Burton passed through a beautiful shaded oak grove before dropping down to the Gabrielino trail and Oakwilde Campground. Sadly, many of those oaks were killed and have fallen across what was the trail. Brush has grown into this relatively flat section of trail, and will require extensive chainsaw work to clear. We plan to go in with the CORBA/MWBA sawyer crew (USFS certified chainsaw operator volunteers) to clear those trees before the next scheduled trailwork day.
Riding previously restored section after a day’s work
With over 1000 volunteer hours, ten workdays, and several additional prep days by CORBA and MWBA trail crew leaders, we have so far completed or brushed approximately 1.8 miles of the 2.25 mile trail. What’s left is less than a half mile, including extensive chainsaw work. Weather permitting, we’ll be back out there on March 13, 2016.
The National Park Service today released the Final Study Recommendations for the Rim of the Valley Corridor Special Resources Study. CORBA has been involved in the Rim of the Valley process since congress authorized the study in 2008, and even before that when the concept was only for a Rim of the Valley trail. We are pleased to see the final recommendation includes most of what we–and many other groups and individuals–suggested in our comments. The recommendation is a hybrid of Alternatives C and D of the draft released last June.
The Secretary of the Interior transmitted the final study to Congress on February 16, 2016. The final study recommends a 170,000-acre addition to Santa Monica Mountains National Recreation Area.The selected alternative would add portions of the Los Angeles River and Arroyo Seco corridors, the Verdugo Mountains-San Rafael Hills, the San Gabriel Mountains foothills, the Simi Hills, the Santa Susana Mountains, and the Conejo Mountain area to the national recreation area. Within the expanded area are: habitat types that contribute to the high biodiversity of the Santa Monica Mountains; functioning wildlife corridors; highly scenic landscapes; historic and archeological sites; geologic and paleontological resources; thousands of acres of open space and recreation areas; and miles of trails, all of which provide exceptional public enjoyment opportunities. Expanding Santa Monica Mountains National Recreation Area would provide new recreational opportunities for one of the most densely populated areas in the United States.
No lands currently managed by the Forest Service (Angeles National Forest and Los Padres National Forest) are included in the proposed boundary expansion of the SMMNRA. However, the National Park Service could partner with the Forest Service on projects, as needed, and as permitted under their current “service first authority.” Existing land managers would continue to manage their lands, but the inclusion of those lands within the expanded boundary of the SMMNRA would allow the NPS to work with them to acquire land from willing sellers, or invest in capitol improvements for recreation or habitat improvements.
The study at this point is just a recommendation from the Secretary of the Interior to Congress. It will be up to congress to take those recommendations and act on them. Or they may not. It many be many years, if ever, before the boundaries of the SMMNRA are adjusted as recommended in the Study.
The final study report, errata from the draft study and an analysis of public comments submitted can be found at http://www.nps.gov/pwro/rimofthevalley/
As we reported last year, Over this past year, CORBA has stepped up our Volunteer Sawyer program within the CORBA Trail Crew. CORBA’s two B-Level Sawyers, Mike McGuire and Steve Messer have worked almost year-round cutting trees off trails around the Station Fire burn area of the Angeles National Forest. We’ve worked side-by-side with Hot Shots fire crews, with Mount Wilson Bicycling Association, with volunteers from other groups, with the Restoration Legacy Crew and others. We’ve cleared trees from more than a dozen trails in the past year, most recently 89 trees from Dawn Mine trail in February.
In the current March 2016 issue of Mountain Bike Action, CORBA President and trail crew leader Steve Messer was interviewed for a story on wildfire impacts to trails, something we’ve been dealing with since the Station Fire. The article is a five-page spread, and features several photos of a typical day of volunteer sawyer work, as we cut a very large tree off Strawberry Peak trail. The article is not yet available online on the Mountain Bike Action web site, but we hope it will be posted publicly in the coming months. Right now it is only available in the print magazine.
This past week Chris from Southern California Outdoor Adventures generously donated a brand new Stihl 291 20″ chainsaw to CORBA. Chris understands the importance of what we’re doing and was happy to make sure we have the best, most efficient equipment needed to get the job done. This helps his shuttle customers enjoy the trails without obstruction. Our current fleet of saws includes a Stihl 16″, the new 20″ and a 25″ saw. The donated 20″ is a great balance between the portability of the 16″ and the capability of the 25″, and will probably become our go-to saw for most jobs. We truly appreciate the support of Southern California Outdoor Adventures, one of the most respected shuttle operators here in Southern California.
The day we received the new saw, Thursday, February 11, we went out to check on trails in the Chilao area. Given the recent storms and high wind–now followed by a heat wave– we knew there was work to be done. We found a number of trees in the Charlton Flat area, along the closed Vetter Mountain trail, and along Silver Moccasin trail. We removed two large trees from Silver Moccasin, before weather conditions (wind and low humidity) forced us to end the day’s work. The new saw was a dream to run! Thanks SCOA!
New sawyer training is being scheduled sometime in March 2016. Candidate Sawyers must have an existing volunteer agreement with the Forest Service, have first aid and CPR certification. First you will be certified as A-level sawyers, allowing you to cut smaller trees under supervision of a B-level sawyer or higher. After a year at the A-level, sawyers can do the additional training and upgrade to a B-level after which they can cut unsupervised and deal with larger, more complex trail clearing operations. These certifications are restricted to bucking and limbing only, meaning we can clear fallen trees from trails, but we can’t fell standing dead trees. Nor do we need to. Let us know if you’d like to become a certified sawyer and help keep our trails clear.
Six years after the station fire, the number of standing dead trees within striking distance of trails, roads, campgrounds and other facilities, is staggering. These trees will continue to fall every time there is a weather event. The Forest Service is actively working to remove hazard trees from around vital infrastructure such as campgrounds and roads, but it’s going to be up to volunteer groups like CORBA, Mount Wilson Bicycling Association, Boy Scouts of America, Angeles Crest 100, and San Gabriel Mountains Trailbuilders sawyer crews to keep our trails clear of downed trees as best we can.
If you find a new downed tree along a trail, or any potentially dangerous or environmentally damaging trail conditions, snap a photo with your phone, record the location and send a quick email to let us know. We’ll either take care of it, or get it to the people who can. It’s best to include a GPS waypoint or position (or simply turn on location tagging on your phone’s camera app).
Sunday, January 24, 2016 we had another successful day of trail restoration. Anyone driving up the Angeles Crest Highway today, who happened to glance across the Arroyo Seco canyon towards Brown Mountain would have seen ten volunteers spread out along the switchbacks, the upper half of which are now clearly visible once again.
Clearing Brush has been a major component of this project
Scouting the work ahead
Today we concentrated on brushing the next .25 miles of the trail, which included six switchbacks. Most of this section has held up extremely well, and only a few places will require rock-armoring and/or drainage restoration. We took the opportunity to scout and flag the next half mile of trail beyond that, identifying the original trail in places where animals and unauthorized trail users–it is still a closed trail–had created unsustainably steep bypasses around heavy brush and a some rock slides.
Our next trailwork days, tentatively scheduled for February 7, and February 21 (with MWBA) we’ll concentrate on tread work for the section we cleared of brush today. There are no major problem spots along this section. We’ll also continue brushing the trail beyond there to re-establish the trail corridor and better see the condition of the tread. In some sections we scouted, the brush was so thick that there was no way through, forcing us either up the slope or down the slope to get around the brush and back on the remnants of trail tread.
Failed switchback #16 will need extensive work
The biggest problem section will be at the 16th switchback. Here the switchback itself has been washed away, and we’ll need to do extensive rock work to make the section sustainable and rideable. Much of the area is soft, loose dirt, and the trail is completely filled with brush, slough and debris. Nothing our dedicated volunteers can’t handle!
All in a day’s work. The hike/ride back out
After today’s work, those volunteers who still had time were treated to lunch at a local restaurant. It is the dedication of these volunteers, many of whom have come out every trailwork day we’ve scheduled, that allows us to keep pushing forward to complete the trail. Major kudos to all of you who have contributed!
January 10, 2016 was another extremely productive day for the Ken Burton Trail Restoration project. With recent storms, it was reassuring to see our of work holding up perfectly well. In fact, the restored sections of Ken Burton fared better than the Upper Brown Mountain fire road, which was rutted and much more rocky than before the storms.
Retaining wall crew at work – Photo by Matt Lay
Once again teaming up with the Mount Wilson Bicycling Association, 21 volunteers were able to do a first-pass cutting brush on 0.3 miles of trail, with tread restoration completed on 0.2 miles of that. Matt Lay, of MWBA led the effort to complete the first wire basket retaining wall. At our last day, the lower retaining wall was completed. The upper wall is almost complete, needing a few more hours of work. There are two more retaining wall sections that will need similar rebuilding.
We were blessed with perfect trailwork conditions. Rain was in the forecast for the night before our event, with most forecasts showing the weather tapering off by morning. That’s exactly what we had: nice damp soil, and cool, comfortable work conditions.
The day before the scheduled trailwork, I took a load of tools up via bob trailer, and did a walk-through video of the section we were to work on. After the trailwork day was completed, I repeated the video walk-through. The before and after videos show what an amazing transformation is possible. The two videos are embedded below.
We also have to thank Pat Phillips, a long-time trailwork volunteer and supporter who helped build the trail in the 90s. He graciously hosted us once again for lunch after the day’s work.
Mount Wilson Bicycling Association will be hosting the next trailwork day on Ken Burton this coming Sunday, January 17. and CORBA will host again on January 24 (both dates are weather-permitting). We all want to see this trail restored and opened!
Thanks once again to the tremendous volunteers for their hard work and dedication.
2015 has been one of the most active in CORBA’s history. There has been so much happening in our local mountains, in our sport, in our public lands, in the political landscape, and in bicycle advocacy in general. As always, CORBA has done its best to stay on top of the issues, to be leaders in the trail community, and to have a positive impact on our trails, our public lands, our community and our sport. Here’s a quick recap of what’s been happening this year, showing how your membership dollars and donations are being used to benefit all mountain bikers in the Los Angeles and Eastern Ventura Counties.
Advocacy
Puente Hills Landfill Meeting
Much has happened this year on the mountain bike advocacy front. One of the biggest issues has been the start of the process to develop a Management Plan for our year-old San Gabriel Mountains National Monument. The National Forest Foundation convened a Community Collaborative group to develop a broad base of support from a diverse range of stakeholders to help guide the Forest Service in its management of the Angeles National Forest and the SGMNM. CORBA has been involved from the start, in 2014 on the committee to establish the Collaborative, and this year as an active participant in the Collaborative. Forty-five diverse interests are represented, some of whom have traditionally found themselves at odds with our community. This has truly expanded our outreach and strengthened our place in the community.
We’re closely monitoring the development of the Santa Monica Mountains Trail Master Plan, which is expected to come out in draft form in 2016. We saw the Rim of the Valley Study completed. Legislation was introduced to create a new National Recreation Area, and expand our new National Monument. We’ve worked with legislators on a pending Wilderness bill, to ensure that it has minimum impact on mountain biking. We’re continuing to work with the Sierra Club and Wilderness Society to ensure that their efforts to protect our public lands do not impact our ability to enjoy them.
This year new e-bike legislation was introduced. Early drafts could have been interpreted to allow electric mountain bikes on non-motorized trails. We worked to clarify that this does not makes e-bike legal on trails. We’ll be watching the e-bike debate closely as they become more popular.
Outside the area, we’re keeping an eye on wilderness proposals in the Sierra Nevada mountains and BLM land swap proposals in the San Jacinto Mountains, both with the potential to close trails to bikes.
Last January the Forest Service allowed some experienced trail maintenance volunteers, who had been previously certified to use chainsaws at the “A” level, to step up their training to a “B” level. Under current regulations, A level sawyers are restricted to 8 inch trees or smaller, and must be supervised. B-level Sawyers are allowed to work unsupervised, on trees up to 24″ in diameter, and can supervise and work with A-level sawyers.
B Level Chainsaw Certification Class of 2015
CORBA President Steve Messer, and volunteer Mike McGuire both received their B level certification, and have been putting them to use all year. MWBA volunteers Mitch Marich, Brad Benam and Erik Hillard also received their A level certification, along with several other individuals and volunteers from other organizations and areas outside Los Angeles.
Together the CORBA and MWBA sawyer team has been cutting trees from trails all year. We’ve cut trees from Brown Mountain, El Prieto, Sunset Ridge, Gabrielino, Strawberry Peak, Colby Canyon, Mount Lowe East, Sam Merrill and Silver Moccasin trails. Six years after the Station Fire, downed trees are becoming a major and constant problem.
Our biggest project has been Vetter Mountain trail. This was a favorite of local mountain bikers, as the first descent of the classic Chilao Loop (or, more accurately, the Chilao Figure-8). The area was one of the most heavily impacted areas of the forest by the Station Fire. Drought has slowed the area’s recovery, and there are still thousands of dead trees waiting to fall.
We began in early spring 2015, first clearing the Charlton Flats loop road of more than two dozen downed trees just to get to the bottom of the Vetter Mountain Trail and Silver Moccasin trail. We cleared all the deadfall from the lower section of Vetter through to the first road crossing. There were many trees beyond our chainsaw certification level, the largest being just over 50 inches in diameter. These were taken care of by Little Tujunga Hot Shots Captain Greg Stenmo, whose support we were grateful to have.
After the summer heat and when fire danger levels and wind conditions allowed, on October 3rd CORBA and USFS volunteers Mike and Robin McGuire returned to begin work on the next section of the trail. In a day’s work, they were only able to clear the first hundred feet of the trail, with the sheer number of trees stacked like Chinese pickup sticks.
We returned on October 8th. In the five days since Mike and Robin were up there, another four trees had fallen across the road. Finally getting to the trail, we began cutting downed trees, poodle dog bush and buckthorn from the overgrown tread. In places it was impossible to see any remnant of trail through the brush and deadfall, so having been familiar with the trail in its pre-fire glory was a must. The time lapse below gives a pretty good indication of what’s been involved in clearing the trail. This is six hours of work compressed to nine minutes.
We returned on October 23, and November 5. On November 5 we started from the top of the trail, near the site of the old lookout and worked our way down. It was a glorious moment for us to finally have cut and cleared over 150 trees from Vetter Mountain trail, Charlton trail, and the Charlton Loop road. After finishing, we went back and inspected the trail from top to bottom, and found a dozen more trees fallen in areas we’d previously cleared.
Once again we returned on December 17, first clearing downed trees off the road, then several new trees that had fallen across Vetter and Charlton trails. Afterwards we joined the Chilao hotshots crew, who were clearing downed trees from Silver Moccasin trail after the particularly strong windstorms of December. With our help, they were able to get the job finished in one day.
The trail remains closed to the public. There are still too many dead trees that have been rotting away for six years, waiting to fall every time the wind blows. More than once, when we finished our day’s chainsaw work as the afternoon winds started blowing, we heard more trees falling. Because of these dangers, we are not willing to take in volunteer crews to begin restoring the trail. Since winds have been blowing steadily this past month (over 70mph the week before Christmas), there are probably many more trees down again.
Currently the Forest Service, along with Fire Crews and us as Volunteer Sawyers, are developing a plan to clear remaining standing trees in the trail and road corridors, so that they don’t continue to fall across the trail every time the wind blows. Currently crews are doing that along the Santa Clara Divide Road so that it can be reopened to vehicles next year.
We hope to begin restoration work on the Vetter Mountain trail next year, after we finish the Ken Burton trail. Stay tuned for details.