Ezra did double duty today as photographer as well as Mark’s assistant because Steve was helping to restore the Backbone Trail near Kanan Road. The weather was perfect for 17 attendees in Malibu Creek State Park this month at the Basic Skills Clinic. The clinic is always held the first Saturday of the month. You can see the photos in our April photo gallery.
Archive for the ‘Rides and Events’ Category
April Skills Clinic photos posted April 3
Sunday, April 3rd, 2016Report on the April 2 Backbone Trailwork from Kanan Road
Sunday, April 3rd, 2016We had an unusually poor turnout for our trail restoration project along the Backbone Trail between Kanan and Latigo Canyon Roads. Even so, our small group of five (4 mountain bikers and one trail runner) got a lot done, and along with the dozen or so volunteers from our partners with the Santa Monica Mountains Trails Council, we worked about a mile of trail, starting on the top of the tunnel just past the first steep hill out of the parking area. The poor turnout of mountain bikers was a real disappointment, especially because this is such a great and popular trail for mountain biking. This is the first leg of the ride between Kanan Road and the Corral Canyon trailhead.
There were three major problems that we needed to address – lack of drains, poorly constructed drains and overgrowing brush that included a lot of poison oak (PO).
We originally scouted this trail about six weeks ago, but we had to scrub that work day because we learned only a couple of days beforehand that there would be a major event that morning, with hundreds of trail runners passing through the work area, and the parking area would be used by support crew.
We scouted the area again last week to flag the spots where we could be working. In just six weeks the amount of growth of the brush, and especially the PO, amazed us!
For dealing with most of the overgrowth, we left that to the Trails Council crew and their gas hedge trimmer. That’s an effective way to quickly deal with overgrowing chaparral and PO. Unlike most brush cuttings that we pick up and dispose of off the trail and out of sight, clippings that contain poison oak are carefully pulled to the side of the trail with a MacLeod (has a 4′ handle) and then shoved over the edge. We try not to touch any part of the handles of our tools to the PO leaves or stems.
The CORBA crew hiked about 1.4 miles to the end of the work area to tackle a corner where there have been mountain bike spills. It turns out that the brush had overgrown the inside of the turn so that the trail had become very narrow and people were riding beyond the outside edge where the dirt was soft. Mixed in with the overgrowing brush were some very vigorous PO bushes. Lacking the gas hedge trimmer, we chopped and hacked the brush around the PO, exposing as much of it as possible, then carefully chopped, hacked and lopped those branches. Where the brush had been removed was about a foot deep of leaf litter, including PO leaves, so we scraped all that away, revealing the original trail tread. Finally, we worked the dirt to give the tread a bit of an outslope (to shed water) and to make it even with the old trail.
That effort took the five of us about an hour and a half. After that, we worked our way back to the beginning, rebuilding blocked drains, filling a few very nasty but short ruts, and building new drains.
Some of the drains we worked turned out to be old drains that were completely filled with dirt. Even thought the trail was on a steep cross-slope, the dirt had piled us several feet off the edge of the trail, like the Mississippi River delta. To make an effective drain, we had to cut down the brush that was growing up around these ‘deltas’ and then push a couple of cubic yards of dirt down the hill. That was before we could even start to construct our typical drainage nicks!
There was a major problem on the first half mile of trail beyond the top of the tunnel. Some person or group had dug poorly designed drains into the trail. They were too narrow and not sloped properly to drain water off the side. The biggest problem was that the outlet at the outside edge of the trail was narrow, so all the water was focused on one spot, eroding a deep rut. With just a few rainfalls, these ruts would start to encroach into the trail and would eventually destroy it. The Trails Council took care of these by widening them out, and also worked on some deeply rutted sections.
Overall we fixed up about a mile of trail, including brushing back the overgrowth. But be careful when riding this trail – the brush and poison oak is growing so quickly that it’s likely to continue to be a problem for some time.
Ken Burton Trail Restoration – Day 14
Sunday, March 27th, 2016Saturday, March 19, 2016, was a perfect day to do trailwork. There was moisture in the ground from the week’s rain, temperatures were cool, and the crew were able to ride to and from the work site via the Gabrielino trail. A half-dozen or so volunteers were already on their way to the work site when this group photo was taken.
While several volunteers rode in via the Gabrielino, some opted to ride up to Brown Mountain and enjoy the fruits of their labor on the way down Ken Burton trail to the work site. It was the first time we had been able to ride all the way down to the 16th switchback without interruption. The volunteers who rode down Ken Burton trail were all in agreement that the efforts of the group over the previous five months had been well-worth the experience.
We were fortunate enough to have several SoCal High school league student-athletes and coaches join us for the day, along with members of the IMTBTrails.com mountain bike forum out of Santa Clarita.
With the major brush work completed, the crew split into groups, concentrated on re-cutting the bench along a heavily damaged section of the trail, restoring outslope, and removing remaining roots and stubs from the tread.
Another crew worked diligently to rebuild the 16th switchback, using rock extracted from the tread to build an outside retaining wall on top of the old wire basket retaining structure that had failed. By day’s end, the switchback was completely rebuilt. We were fortunate to have the expert assistance of Hans from Bellfree Contractors on this major effort.
By day’s end the crew had completed tread work almost all the way down to the 17th switchback, restoring one of the more heavily damaged sections of the trail so far.
So far, 81 individual volunteers have put in 1,408 total person-hours of work on this project in 14 scheduled work days, plus another 12 prep days. This is an impressive effort to restore this much-loved trail that was built by mountain bikers from the Mount Wilson Bicycling Association in the early 90s.
The next scheduled group work day on Ken Burton will be with Mount Wilson Bicycling Association on April 17, though there will be additional prep days before then. Contact Steve@corbamtb.com if you’re interested in helping prep before then (likely April 10).
Report on the 2016 COSCA Spring Trailwork Day on May 19
Saturday, March 19th, 2016Although we didn’t have to repair humongous El Nino rain damage that we were expecting, we still had ruts to fix that had been growing for years.
About 40 people volunteered to help work on trails today for the annual COSCA Spring Trailwork Day. We split into two groups, about 15 working on the bottom of ‘Space Mountain‘ (the singletrack section of the Los Robles Trail West) while the rest went to the ‘Lily Tomlin Trail’ which connects the East and West halves of the Los Robles Trail. Both trails had major ruts, not having had any restoration work done on them for years. The work consisted of filling in ruts, restoring the trail outslope so water would run off it rather than down it, and building drainage nicks. On Space Mountain, we restored most of the first 1500′ of trail. Naturally, if we’d had more people and time, we could have done a lot more. The soil was perfect – moist and easy to dig and pack, and there was a low cloud cover to keep the temperatures cool.
Space Mountain is CORBA’s adopted trail and we’ve worked it a number of times in the past, but then we started at the top, or half way down, and worked our way to the bottom. This is the first time we’ve started at the bottom and had enough time to properly fix the ruts.
The group working on Space Mountain consisted of 6 from CORBA, 6 from the Santa Monica Mountains Trails Council (SMMTC) Meetup hiking group, and the rest from the Weekday Trailblazers Meetup hiking group. A few other Weekday Trailblazers were working on the Lily Tomlin Trail along with a number of SMMTC and other community volunteers.
After about 3 1/2 hours, we all headed back to the parking area where Rangers were preparing a barbecue lunch for the volunteers. Ranger burgers, hot dogs, chili and vegi-burgers always taste great! Chatting over our food, it was clear that everybody was happy with and proud of the work they’d accomplished to improve the trails for everyone. CORBA and the COSCA Rangers thank everyone for coming out to help and really appreciate their effort!
You can see more photos in our 2016 COSCA Spring Trailwork photo gallery.
Ken Burton Trail Restoration – Days 12 and 13
Monday, March 14th, 2016Day 12, March 3, 2016
On Thursday, March 3, CORBA and MWBA Volunteer Sawyers and some additional dedicated volunteers continued work on the Ken Burton trail. This time they started at the bottom of the trail, from its junction with the Gabrielino National Recreation Trail, working up the lower switchbacks through a tangle of downed trees, poison oak, overgrowth, and near-impossible wayfinding. Using chainsaws was the only viable means of cutting through the several fallen oak trees that once shaded this beautiful old oak grove. This shaded oak grove was often a popular spot to re-group after challenging oneself to clean all the switchbacks, before attempting the most difficult between there and the Gabrielino trail.
Steve Messer had spent February 20 flagging out the original trail, using a combination of GPS tracks, searching for ground evidence of dirt compaction that may still be found even after six years, and a good memory of one of his favorite trail loops.
The group made what appeared an impossible task look relatively easy, working carefully to cut brush, downed trees, and have swampers carry away and stash the cuttings. It was most gratifying to follow the string of ribbons, and find the original tread under all that brush and debris. We made it to the 17th switchback, our target for the day.
Day 13, March 13, 2016
Ten days later, on Sunday, March 13, 2016, was our 13th group trailwork day. It was especially encouraging to see that all our previous work has held up perfectly to the recent rain and storms, with no rutting, and soil being packed down nicely. The first sections we worked on last November are maturing nicely.
Our 13th worday on Sunday March 13, was a milestone day. With 21 volunteers out putting in a 7 hours or more, we were able to do a first-pass brushing on the last remaining section of trail, linking to our March 3rd work and to the bottom of the trail. This was a great milestone in this restoration project, now in its sixth month. We had cut brush from the entire trail corridor.
While the brushing tools and swampers diligently plugged away to reopen the trail corridor, the tread crew made quick work of the tread on about .3 miles of trail. With the damp dirt, cool temperatures, and sense of determination among the volunteers–many of whom have worked multiple days on this project–we had an extremely productive day.
There is still work to do on the 16th switchback, but it was rendered temporarily passable for the day. The last half mile of the trail is far from finished, needing a second pass with the hedge trimmers and extensive treadwork. But with some careful hike a bike the group was able to ride out the bottom of the trail, completing the loop with the closed Gabrielino trail. It was a truly gratifying day for all who made it.
We currently estimate two to three more days working on the bottom of Ken Burton trail, and an additional day on the Gabrielino trail between Oakwilde/Ken Burton and Paul Little.
We were also joined by an Ultra Distance runner, and past AC100 runner. Many trail runners are just as excited to get this trail opened as mountain bikers. During our last two days of work and long before we were finished brushing the corridor, we had hikers come up from the bottom, bushwhacking their way through until they heard us, then asking where the trail was. After reminding them the trail was closed to the public and we were working as Forest Service volunteers to rebuild it, he headed on beyond our work area for a leisurely stroll up the newly groomed segment of the trail, and all the way to Brown Mountain. People put far too much faith in outdated maps and information.
After loading up tools, the group rode out via the Gabrielino trail back to the trailhead and our meeting spot. This section of the Gabrielino trail was worked on two years ago by Bellfree Contractors. volunteers, and the Los Angeles Conservation Corps with the financial support in the form of an REI grant to CORBA, and funding from the Forest Service for the project. While the section was rebuilt, it has been two years and it also once again needs some minor work. Between Oakwilde and Bear Canyon the trail is in poor condition and almost entirely gone and unrecognizable for a long stretch. Plans are underway to continue work on rebuilding that section of the Gabrielino, once again in partnership with the LACC, USFS, Bellfree Contractors and REI.
Both the Gabrielino between Paul Little and Bear Canyon junction, and the Ken Burton trail, remain closed to the public by order of the Forest Service. Please respect the closure until the Forest Service opens the trails. We’re just as eager as everyone else to finish the project and be able to ride, but there are many steps to go through before that can happen, and it is the decision of the Forest Service as to when and if the trail will be opened.
For all the volunteers who have joined us for at least two days, we’ve ordered a special commemorative T-shirts. It’s our–CORBA and MWBA– way of saying thank you. If you haven’t put in two days, there are a few more coming up starting this weekend and in April.
March Skills Clinic photos posted March 6
Sunday, March 6th, 2016We had another unusually large class of 24 on a cool, cloudy day in Malibu Creek State Park this month at the Basic Skills Clinic. The clinic is always held the first Saturday of the month. You can see the photos in our March photo gallery.
March 2016 eTerraTimes Newsletter Published March 3
Thursday, March 3rd, 2016The March 2016 edition of CORBA’s monthly newsletter, the eTerraTimes, was published today, March 3. If you don’t get it by email, you can view it online.
As always, the eTerraTimes has all the latest news for mountain bikers in the Santa Monica Mountains and surrounding areas.
CORBA Palos Verdes Trailwork Report
Wednesday, March 2nd, 2016On Saturday, February 27, 2016, fifteen dedicated CORBA volunteers came out to support the City of Rancho Palos Verdes efforts to restore the Toyon Trail. Organized by long-time CORBA PV coordinator Troy Braswell, the group took part in trail repairs, invasive weed removal, and planting native shrubs. They worked alongside City employees and other volunteers. Cory Linder, from the City’s Parks & Recreation department was on hand to oversee and coordinate all the volunteer efforts.
The City of RPV has been conducting ongoing restoration work every Saturday in February, with the final work day scheduled for this coming weekend, March 5th. To learn more about volunteer opportunities in Rancho Palos Verdes, visit http://www.rpvca.gov, and stay on top of RPV happenings at CORBA Palos Verdes.
We are happy to see the RPV Parks & Rec department stepping up their volunteer program, and are even happier to be able to contribute. Thanks to all the dedicated volunteers who came out to improve the trails and landscape for everyone!
GGR: Girlz Gone Riding News!
Wednesday, March 2nd, 2016GGR is so very excited to announce a NEW location for this year’s annual Rocktober Festival & CORBA membership drive! This year the Rocktober Festival will be held at beautiful Castaic Lake October 30th, 2016. Castaic Lake
The festival consists of guided cross country rides, skills clinics, guest speakers, exhibitors, giveaways, tons of demo bikes and best of all………this is a FREE event for all GGR club members. Children will be welcomed at this year’s festival as well. Registration goes up August 31st. The festival closes at 300 pre registered riders. For more event details, check out the GGR site here: Rocktober Festival October 30th 2016
Director of GGR Wendy Engelberg was more than thrilled to accept a Specialized ambassadorship for 2016. What exactly does this mean? It means Wendy will continue to work in the community bringing on women mountain bikers, keeping women cycling, being an advocate for women’s mountain biking and working closely with Specialized: Specialized and Cynergy Cycles: Cynergy Cycles a Specialized Concept store. Wendy will be at Cynergy Cycles once a month bringing women out on demo rides and guiding them in with their new mountain biking journey. She will also assist Specialized with dirt demos. For 2016, Wendy will be riding a Specialized women’s specific bike. The Specialized ERA Expert: Specialized ERA
Read the complete story here: GGR Director Signs on with Specialized
Look for the April issue of Mountain Bike Action on sale March 3rd. Wendy wrote a feature for MBA called: “How to get your wife or girlfriend to love mountain biking” (Hint: Stay out of it!)
Thanks to our model Anne Russell, Jose Gonzales and photographer Jesse Ettinger for making this happen. Also a shout out to GGR Coach Christine Hirst who helped with the article as well. Please purchase the magazine and if you love the piece, let the editor know! It’s important to give them feedback to keep the articles relative to women AND men coming!
GGR CO-ED NIGHT RIDES ARE BACK IN MARCH! Check out our March Calendar for our summer CO ED evening rides. All level, no drop rides! Some Thursday nights, some Wednesday nights. GGR Calendar
Monthly Club Rides!
If you didn’t know, GGR’s monthly ladies only club ride is the last Saturday of every month. Times will change when the heat becomes a factor.
Join our Board Meeting every 4th Monday
Tuesday, March 1st, 2016Come and join us to learn about current issues and let us know what concerns you! Always open to the public, the CORBA Board of Directors’ meeting is held the 4th Monday of the month in Woodland Hills. REI is kind enough to let us use their meeting room, for which we thank them profusely!
Every month (except December, when we have no meeting), we discuss these topics:
- Issues of trail access for mountain bikers
- Mountain bike advocacy and ambassadorship
- Public involvement
- The latest news from the land managers, including State Parks and National Park Service
- Trail building and restoration
- Furthering woman’s mountain biking
- Bike parks and other dedicated mountain bike facilities or trails
- Education and etiquette
- Anything brought forward by members of the public
The meetings are 6:30 – 8 pm at the REI in Woodland Hills:
6220 Topanga Canyon Blvd
Woodland Hills, CA 91367
P: (818) 703-5300
We look forward to seeing you there!