Glendale’s Newest Trail’s are Complete

Glendale's new Catalina Verdugo Trail

Glendale’s new Catalina Verdugo Trail

When the City of Glendale updated its Trail Master Plan for the City’s open spaces in 2007 and 2008, CORBA volunteers worked closely with City staff to map out existing trails and to identify where new trails would make the most sense. The first two of those new trails have  just been completed.

The Catalina Verdugo Trail loops around the Glendale Sports Complex at the end of  The northern trailhead is next to the Maintenance yard facility. The Southern end of the trail is behind the soccer fields, and comprises a series of switchbacks. Glendale has many difficult and steep trails like those at Brand and Deukmejian Parks, so City officials wanted this to be an easy trail for all levels of trail users to enjoy. The trail is open to hikers and mountain bikes only. The trail joins an existing fire road, from which there is access to Ridge Motorway, a lightly used fire road in the San Rafael hills.  From there it is possible to ride or hike all the way to the trail system at Cherry Canyon.

As with all newly constructed or recently re-built trails, it currently looks quite wide and raw. Over the coming months as the trail beds in it will naturally narrow down and brush will grow in along the trail.  It will be a beautiful, meandering trail through the Chaparral.  There is some steep slopeside exposure in a few sections, but overall it is a non-technical trail suitable for fit beginners and more experienced riders alike. Watch for poison oak along the trail, mostly on the north-facing slopes.

Mountain Do Trail exercise station photo by Robin McGuire

Mountain Do Trail exercise station

The second trail, and also a part of the Sports Complex trails,  is called the Mountain Do Trail. This is a wheelchair accessible, natural surface path, complete with a range of outdoor exercise stations, benches and tables. The Mountain Do Trail wraps around the soccer fields at the Southern end of the Sports Complex. Within the next month, signs and  interpetive panels with information on Flora, Fauna and local history will be added to both trails, making them a great educational resource as well. The Sports Complex is open from 7:00 a.m. to 10:00 pm and the gates are locked, so access to the trail is restricted outside those times.

The City is planning a formal opening ceremony on June 1st, National Trails Day, but the trails are now ready for use. These trails were expertly designed and constructed by Bellfree Contractors, in accordance with the City of Glendale Trails Master plan. For more information, a map and more photos visit BellFree Contractors’ web site.

Tags: , ,

Comments are closed.