Archive for the ‘Angeles National Forest’ Category

Trailwork Report: Gabrielino and Rim Trails, Angeles National Forest

Saturday, December 17th, 2011

Over the first weekend in December, 2011, CORBA trail crew volunteers came out to help restore the fire-damaged trails of the Angeles National Forest.

Gabrielino Trail, December 3, 2011

On a cool and mostly clear Saturday, CORBA and Mount Wilson Bicycling Association volunteers teamed up to work on the Gabrielino trail. The Gabrielino between Switzers and Redbox was opened to the public back in May 2011, though the trail has had little attention and was in very poor shapte. Through many sections the old trail is simply non-existent.  Starting at Switzer’s Day Use area, the volunteers worked their way up the trail.

At the outset, two large trees were removed from the trail. These had toppled in the ferocious wind storm of November 30, 2011, and were not present when the trail was surveyed for work a week earlier. A third tree remains and is too massive to move with hand tools. The yellow warning signs greeting trail users on trails that pass through burn zones has a clear message: That trees, weakened by the fire, pose a considerable hazard and may fall at any time. Especially now, more than two years after Station Fire, dead trees are beginning to rot and weaken. Falling trees will continue to be a danger for years to come.

The volunteer trail crews, led by Mitch Marich of the MWBA, and Hans Kiefer and Steve Messer from CORBA, rebuilt two severely damaged drainages that required extensive rock retaining walls and rock armoring. In addition, tread was outsloped and widened along many narrowed sections and the brush was cut back. The crews worked on approximately 1.3 miles of trail, from switzers to the second stream crossing and switchbacks. Some sections of the trail now run along the alluvial wash at the base of the canyon. This was created by the tremendous water and debris flows of the past two winters. However, all of the trail worked on by the crew is now easily negotiable for trail users (with the exception of the one large downed tree that remains). With another day’s work in January, we hope to have the entire trail clear of significant obstacles and seeing regular use once again.

Moving rocks and re-building the trail:

Moving Rocks on the Gabrielino

(more…)

Trailwork December 3/4 – Angeles National Forest

Monday, November 21st, 2011

Gabrielino Trail

Join the CORBA trailcrew to help restore the Gabrielino Trail between Switzers and Redbox on Saturday, December 3.  You don’t need any experience, and you’ll be helping get a great trail back to a rideable condition.

We will be working with the Mount Wilson Bicycling Association and other groups to get this section of trail re-established. There are a number of sections of the trail that need to be rebuilt from washed out drainages, some brush that needs to be cut back and cleared, and a lot of debris on the trail. The work will be weather permitting, so if there is a threat of rain, check here the night before. Wear sturdy shoes, long sleeved shirt, long pants, and bring gloves if you have them. We will supply gloves, hard hats and lunch. RSVP or send any questions to trailcrew@corbamtb.com or on the MWBA Facebook Event.

Where: Switzers Day-Use Area Upper Parking Lot (Map), Angeles National Forest. Carpool from the Angeles Crest Highway just north of the 210 freeway. (Map to Carpool Spot)

What to bring: You MUST wear long pants, long sleeved shirt, sturdy shoes and gloves (if you have them). We will supply hard hats and tools, along with instruction and supervision.

Please RSVP to trailcrew@corbamtb.com.

 

————————————

Rim Trail

On Sunday, December 4th, we’ll work on the Rim Trail off Mt. Wilson.  We will clear the trail of brush, re-establish the bench and clear slides in several places. The work will be weather permitting, so if there is a threat of rain, check here the night before. Wear sturdy shoes, long sleeved shirt, long pants, and bring gloves if you have them. We will supply gloves, hard hats and lunch.

Meet at Mt. Wilson parking lot near the Cosmic Cafe (map) at 9:00 a.m. on December 4th. Carpool from the ACH just north of the 210 freeway at 8:00 a.m. (Map to Carpool Spot)

RSVP or send any questions to trailcrew@corbamtb.com.

Mueller Tunnel Contract Awarded

Friday, November 18th, 2011
Extensive Damage to Mueller Tunnel

Mueller Tunnel will be repaired 2012

Back in January 2011, we reported that the Federal Highway Administration (FHA) was seeking public comment on the rebuilding and restoration of the Mt. Lowe Truck Trail adjacent to Mueller Tunnel. We submitted our comments, fully supporting the rebuilding and re-opening of the road, and encouraged CORBA members and other trail users to do the same.

At the November 2011 Angeles National Forest Volunteer Meeting, the Forest service announced that the contract for the repair project has been awarded by the FHA. This is great news for the trail community and for safety, as the Mt. Lowe road is needed for both fire fighting and as an alternative escape route from Mt. Wilson. Mt. Lowe Truck Trail provides mountain bikers and hikers access to the Mt. Lowe trail, Sam Merrill Trail, Idlehour trail, and was a popular shuttle option from Mt. Wilson road. It was originally constructed in 1942. It also provides volunteer trail crews like CORBA’s convenient access to those trails for trailwork.

While the contract has been awarded, the work has not yet been scheduled. Winter weather will dictate when the work can begin, but it is expected to start sometime in the spring. Once completed, the Forest Service expects to re-open the Mt. Lowe fire road. We hope to be riding through the tunnel in Summer 2012.

Ski Area Recreational Opportunity Enhancement Act of 2011 Signed by Obama

Wednesday, November 9th, 2011

On November 7, 2011, President Obama signed into law the Ski Area Recreational Opportunity Enhancement Act of 2011 (S. 382/H.R. 765). A version of this legislation was first introduced by Senator Mark Udall (D-Colorado) in 2008, and again in 2010. The bill was re-introduced in February 2011, and this year passed both the House and Senate. It has strong support from both the mountain bike community and the Ski industry. IMBA testified in favor of the act earlier this year and has signed a formal Memorandum of Understanding with the National Ski Area Association to help increase visitation and improve summer mountain bike experiences at U.S. ski areas.

The Act amends the National Forest Ski Area Permit Act of 1986 and clarifies the authority of the Secretary of Agriculture to “permit appropriate additional seasonal or year-round recreational activities and facilities on National Forest System land subject to Ski Area permits.”  The act goes on to specifically mention mountain bike terrain parks and trails, zip lines, frisbee golf courses and ropes courses as acceptable additional recreational activities for ski areas. It excludes activities such as tennis courts, water slides, swimming pools and golf courses.

This should make it easier for ski areas to get the required permits to operate mountain bike parks during their summer off-season. Year-round recreation at ski resorts is expected to create additional jobs and increase local commerce. Ski areas must still comply with environmental regulations when operating year-round, and their primary function has to remain snow sports.

In the Angeles National Forest there are four ski areas: Mountain High (East, West & North), Mt. Waterman, Ski Sunrise and Mt. Baldy. For a few short weeks in 2009 Mt. Waterman opened to bicycles in the summer, but was forced to abandon its mountain bike park plans because of the limitations of their ski area permit. The passage of HR 765 now allows the Secretary of Agriculture to issue permits for mountain bike parks to existing ski area permit holders.

This is a great step forward and one that will hopefully increase our opportunities for lift-access trails and bike parks in the years to come.

San Gabriel Watershed and Mountains Special Resource Study – Revised Draft Released

Friday, October 28th, 2011

The National Park Service is conducting a “special resource study” of portions of the San Gabriel River watershed and the San Gabriel Mountains. CORBA attended the previous round of public input sessions and reported on the process in 2009.  In the original study proposal there were three alternatives presented, A, B, and C.  We supported and recommended a combination of the areas proposed in Alternative A and the management strategies proposed in Alternative C.

In the recently released executive summary, the NPS reports that it has made the following determinations about the study area:

  • Natural and cultural resources of the San Gabriel Mountains and Puente-Chino Hills are nationally significant, in that they meet all four of the NPS criteria for national significance.
  • The study area is suitable for inclusion in the national park system because it represents natural and cultural resource types that are not already adequately represented in the national park system or protected by another land managing entity.
  • The NPS determined that a collaborative partnership based park unit which respects the complex mix of land use, ownership, and regulatory authority in the study area would be a feasible addition to the national park system. A large traditional national park unit, owned and operated solely by the National Park Service, is not feasible.
  • Need for NPS Management: NPS management in partnership with existing agencies and organizations is the best option for enhancing protection of significant resources, for improving access to recreational opportunities in the region, and for providing coordinated interpretation and education about significant resources.

Multi-Use Signs on El Prieto

Monday, August 29th, 2011

Since the trail re-opened in May this year, El Prieto has seen heavy use by cyclists eager to get back to the trails Friends of El Prieto, Banner Moffat mounts the multi-use sign to the newly installed post.they love. Recently there have been a few complaints from hikers being startled by bicycles on El Prieto.

Multi-Use SignCORBA donated to the Forest Service a set of IMBA multi-use trail guideline signs to be installed on El Prieto. Signs are needed to help inform and remind cyclists to be aware of other trail users and slow down and yield to hikers and equestrians. If cyclists want respect on the trails, we have to give respect to other trail users. IMBA’s “Rules of the Trail” are the standard to which we need to hold ourselves and our fellow riders.

Banner Moffat of the Friends of El Prieto and Steve Messer from CORBA spent Thursday afternoon, August 25, carrying in the signs, posts and tools. They installed the first sign near the picnic bench mid-trail that afternoon. The remaining signs at the top and bottom of the trail were installed by Banner and volunteer Ben Bertiger the following day.

All of the trails open to bicycles in Southern California are multi-use, and hikers or equestrians love the trails as much as we do. We urge riders to be respectful of other trail users, to help ensure that these trails remain multi-use, and to strengthen our case to open new trails to bicycles.

 

Banner and Steve with the newly installed sign

 

Canyon Trail Closure in Placerita Canyon Nature Center

Monday, August 29th, 2011

The Canyon trail winds its way for 1.85 miles along Placerita Creek between Walker Ranch and the Placerita Canyon Nature Center. It makes a great loop with the Santa Clara Truck Trail and Los Pinetos. For many years cyclists have been riding this great loop, and it is a local favorite. It is one of very few beginner- and kid-friendly trails in the Santa Clarita Valley.

In July 2011 the trail was posted closed to bikes with no public notice, warning or input. Law enforcement have been on hand to ticket cyclists who ignore the signs, or didn’t notice them.

The alternative return route after riding Los Pinetos  is to ride pavement from Walker Ranch out to the Nature Center and back to the usual parking area. This paved, narrow two-lane road has no shoulder and no bike lanes, and is much more dangerous.  There is no alternative easy out-and-back off-road ride for beginners or those looking for an easy ride.

In County Nature Preserves like Placerita Canyon, it is at the sole discretion of the director whether trails are opened or closed to bikes. Local riders have been in contact with the park’s management about the closure, and are working to find solutions to mitigate the concerns that have led to the closure of the trail to bikes.

While it is encouraging to know the County is open to hearing the concerns of local trail users who are directly affected by this closure, to have received no prior official or public notice of the closure has left the local cycling community frustrated and angered. The reasons for the closure were unclear, though environmental impacts to Placerita Creek were initially mentioned. However the trail remains open to equestrians who have much more impact than bicycles. Trail user conflicts seem to be the real reason, though to our knowledge no specific injuries or instances have been cited. 

CORBA has long argued that excluding a user group from a trail only leads to further division among user groups, whereas including all users helps bring the trail user community together to find solutions. As the local cycling community works with the County to find a reasonable compromise to re-open the trail, cyclists should avoid riding the Canyon Trail and obey all posted signs in the area.

Read more of the local perspective from the RightOnSCV.com blog or coverage from The Signal.

 

Beware the Poodle Dog Bush

Thursday, July 21st, 2011

Poodle Dog Bush, this example about six feet tallThis pretty but toxic native bush is wreaking havoc on many trail users in the recently opened Station Fire area.

Many people have been returning to the Angeles National Forest since the opening of the trails in May. As summer weather entices riders to the high country, many are getting their first glimpses of a changed forest. One of those changes is the abundant Poodle Dog Bush.

Poodle Dog Bush, also known as Common Turricula, or Purple Flower Poodle Bush, is a beautiful purple flowered native bush. It’s an opportunist. Its seeds will lie dormant in chaparral areas for many years waiting for a major disturbance of the soil. Fire is one such disturbance, and the Station Fire has brought the bush back to life with a vengeance.

People often stop on the Angeles Crest Highway or along trails to pick the pretty purple flowers. It is unfamiliar to most people, and quite attractive. It has long slender serrated leaves and flower stems similar in appearance to Phacelia, though it has an upleasant, slightly pungeant odor. The stems grow from the base of the plant and it can grow to eight feet tall.

What people don’t realize is that the bush is covered with tiny hairs similar to stinging nettle, seen clearly in the close-up image below. However, there is no immediate pain or sensation like nettle gives. Poodle Dog hairs will latch on to bare skin or clothing and release a toxin to which most people will have a severe contact dermatitis type reaction. The swelling, rash and itching appear twelve hours to two days after contacting the bush, and the rash can last for two weeks or more and require medical attention. Severe cases can result in large blisters.

Poodle Dog Bush Stalks, clearly showing the fine hairs

The bush is more prevalent at higher elevations, but can appear throughout the recently burned areas. Forest Service officials have stated that the current post-Station Fire bloom is the largest in recent history. Trail users and trail maintenance volunteers need to be especially cautious, as it has appeared along many trails including narrow single track trails where it is difficult to avoid.

If exposed to the bush, avoid scratching the affected area. Clothes, tools or other equipment that has come into contact should be handled with caution and washed separately from other clothes. Calamine or over-the-counter Hydrocortizone cream may provide some relief, but if blisters begin to form medical attention may be required. Poison Oak remedies such as Zanfel or Tecnu have little effect, but washing the area as soon as possible after exposure is advised.

We need to be aware of Poodle Dog Bush. It’s life-cycle can last up to ten years after a significant fire or other disturbance. Eventually it will die off and lay dormant once again, waiting for the next big fire to come back to life.

Charleton Flats/Chilao: Trail Conditions two years after the Station fire – ride report

Sunday, July 17th, 2011

July 9, 2011 – With some trepidation we headed up to the San Gabriels to ride our favorite trail Charleton Flats to Mt. Hilliard. This was our first time seeing the trail after two years of waiting for the area to recover from the devastating Station fire. We wondered if we would find any remnants of the trails that had given us so many of our favorite challenges, weekend warrior tales and weary pleasure savored for days afterwards. Our questions were soon answered with both good news and bad.

First the bad news. From the Charleton Flats picnic area parking lot , the single track heading up towards Vetter Mtn. was mostly rideable but there is some eroded soft spots, a few trees down across the trail and tall purple flowers blooming in profusion everywhere whacked us in the face as we navigated along the faint trace of the trail. We lost the trail somewhere near the road crossing and pedaled up the main road the rest of the way to the summit. Just before reaching the summit, I saw that the Vetter single track is signed “Closed” and to please respect the closure. It is closed from top to bottom. As if it wasn’t badly eroded enough before, I could well imagine it might be completely demolished now. The Lookout burned completely to the ground. The Lookout volunteer who was there explained money is being raised to rebuild it with the help of volunteers.

We descended on the road and turned left to head over to the Silver Moccasin fire road and Chilao. The Silver Moccasin was in pretty good shape not drastically different than two years ago. Perhaps more loose rock and sand. Picking up the single track I was pleased to see it completely intact with little to no damage. However, the surrounding areas on either side of the trail were completely burned. Dead blackened trees and shrubs stood out in stark contrast to the purple flowering plants and greenery beginning to establish itself. This area that was moderately tree and chaparral covered is now so open you can clearly see the Mt. Wilson radio towers in the distance.

Crossing the Chilao Road the trail continued intact with intermittent burned areas merging with swaths of green that survived the blaze untouched. Although we did not meet any other bikers, we did see a pair of hikers and a group of four equestrians. There were several cars parked at Chilao and other vehicles busily zoomed up and down the road. The only significant change to the Silver Moccasin was the creek crossing just before hitting the paved road which used to be rideable, now requires a hike-a-bike across the creek on two fallen trees. At the Chilao Ranger Station, we stopped briefly to get water when we saw the Forest Service staff who were loading a truck start to run, grabbing equipment and stuffing tools into their pockets. The loudspeaker blared out names of units to respond to a small brush fire somewhere I couldn’t make out. Pedaling out the road, we had barely reached the gate down to Alder Creek when we heard the “thwack, thwack, thwack” of helicopter blades as it lifted off bound for the fire no doubt.

The road towards Mt. Hilliard seemed much the same as before. The only slightly unusual thing was the traffic on the road. One off road motorcyclist and three SUV’s barreled past us where we usually encounter no one. Perhaps they were just as curious as we were to see the extent of the fire’s damage. As we arrived at the single track leading up to Mt. Hilliard, I was stunned by the barren slope stripped of the manzanita, trees and chaparral leading up to the first big impossible (for me) hill climb up to Hilliard. I was relieved to see tall green conifers still standing majestically on the hill. The sandy single track was still there slightly modified by several rain run-off berms. The rest of Hilliard was as I remembered – that was the really good news. I was so busy grinning from ear to ear I barely caught a glimpse of two groups of hikers sitting in the shade of the boulders.

CORBA’s trail crew is waiting on the Forest service to schedule work up there, but nothing is planned just yet. Please come out with the trail crew and lend a hand to repair Charleton/Chilao and other trails we love to ride. Upcoming work days will be posted on the CORBA calendar so check the calendar and stay tuned!

By: Louisa Bonnie

Station Fire Recovery Efforts Covered in Mountain Bike Magazine

Friday, June 25th, 2010

The Station fire has been a devastating blow to outdoor recreation throughout Southern California. CORBA’s Steve Messer was recently interviewed by Mountain Bike Magazine about the extensive damage and impact to the trails, and pondered on how the recovery efforts might proceed.

Messer was probably the last person to ride Sam Merrill, Sunset Ridge and El Prieto trails before the fire swept through the area. Ironically, he was on his way with CORBA’s trail crew to do some trail repair work on Sunset Ridge trail as the fire broke out.

It’s clear that the recovery will take many years. At present it is too early in the process to speculate on when the forest and severely damaged trails may re-open. The Mountain Bike magazine story does a nice job of laying out the challenges and opportunities, and showing how CORBA, the Mount Wilson Bicycling Association and others might be called to action going forward.

The full article is available as PDF document.