February 23rd Space Mountain Trailwork Report and Photos

This past Sunday, 12 CORBA volunteers and two COSCA rangers headed up the “Space Mountain” section of the Los Robles Trail in Thousand Oaks to fix up the 1.7-miles long switchbacks part of this singletrack trail before the winter rains worsen the ruts.

Clearing slough from the trail

Clearing slough from the trail

By all standards, the work was a tremendous success! We cleared slough from 230 yards of trail, installed about a dozen new drainage nicks, cleaned debris out of about a dozen existing drainages, and whacked out about 20 stumps.

From the top of the switchbacks, we continued another a short distance to fix the falling slough on 230 yards of trail. Slough is rocks, dirt and other debris that falls on the trail from above. So much had fallen that half to 2/3 of the trail was covered, forcing people to the very outside of the trail. We could see many tracks where people had ridden off the edge and possibly taken a tumble. With the trail now returned to it’s full width, that hazardĀ is much reduced.

Next, we headed back down to the bottom, installing new drainage nicks as we went, and hacking out stumps that had become hazards in or near the edge of the trail. Finally, as we got to the lower half where we had installed drainages in previous years, we cleaned out those that were becoming clogged with silt so they would continue to be effective in diverting rainwater off the trail.

You can see the volunteers working in the photo gallery of Sunday’s trailwork day.

After the traditional prize give-away to thank the volunteers, CORBA treated everyone to lunch at Baja Fresh.

Thanks to all the volunteers who came out to help, and the COSCA Staff who joined in to support us!

Comments are closed.